BLD-Final | 7/31/2002 | 7/31/2002 | 7/31/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/31/2002 at 09:09:38. Contact: ###-####. C/C issued 7/31/2002 1:39:07 PM
|
BLD-Final | 7/29/2002 | 7/29/2002 | 7/29/2002 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/29/2002 at 10:05:45. Contact: ###-####. No access....and need HVAC...... 7/29/2002 1:51:03 PM
|
BLD-Energy code compliance | 5/20/2002 | 5/20/2002 | 5/20/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/20/2002 at 08:30:35. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/13/2002 | 5/13/2002 | 5/13/2002 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/13/2002 at 11:27:17. Contact: ###-####. C/N.....Posted. 5/13/2002 2:09:26 PM
|
BLD-Framing/Rough-in | 5/1/2002 | 5/1/2002 | 5/1/2002 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/01/2002 at 08:37:15. Contact: ###-####. Shear OK. 5/1/2002 5:06:55 PM
|
BLD-Aging Inspection | 12/24/2001 | 12/24/2001 | 12/24/2001 | | PART |
Jim Sly
|
|
|
WIP 12/26/2001 10:31:16 AM
|
BLD-Foundation | 10/23/2001 | 10/24/2001 | 10/24/2001 | A | PASS |
Jim Sly
|
|
|
###-#### LOGAN
|
BLD-Footing | 10/23/2001 | 10/23/2001 | 10/23/2001 | P | PART |
Jim Sly
|
|
|
###-#### STEVE
|
BLD-Footing | 10/22/2001 | 10/22/2001 | 10/22/2001 | P | CANC |
Jim Sly
|
|
|
STEVE ###-#### LATE PM IF POSSIBE Canc by Steve 10/22/2001 2:55:31 PM
|