BLD-Conference | 7/25/2002 | 7/26/2002 | 7/26/2002 | P | FAIL |
Tony Young
|
|
|
MARK ###-####
need trades signed off b-4 a final can be done 7/26/2002 4:30:19 PM
|
BLD-Framing/Rough-in | 12/14/2001 | 12/14/2001 | 12/14/2001 | P | PART |
Tony Young
|
|
|
###-#### mark
ok to cover pending trades,(int. existing
wall) 12/14/2001 2:20:56 PM
|
BLD-Energy code compliance | 12/10/2001 | 12/11/2001 | 12/11/2001 | A | PART |
Tony Young
|
|
|
MARK ###-####
c/n posted, need to see more after existing wall is removed and fireplace is built///ok to sheet rock unafected areas,,, need to have rouph pass on fp and furnace 12/11/2001 11:38:21 AM
|
BLD-Energy code compliance | 12/7/2001 | 12/10/2001 | 12/10/2001 | A | FAIL |
Tony Young
|
|
|
MARK ###-####
c/n posted, need to meet builder on site 12/10/2001 12:15:20 PM
|
BLD-Energy code compliance | 12/6/2001 | 12/7/2001 | 12/7/2001 | P | NR |
Steven Webb
|
|
|
###-#### MARK No insulation installed--contacted contractor-he will reschedule. 12/7/2001 1:15:25 PM
|
BLD-Energy code compliance | 12/7/2001 | 12/7/2001 | 12/7/2001 | P | CANC |
Tony Young
|
|
|
###-####
|
BLD-Framing/Rough-in | 12/6/2001 | 12/6/2001 | 12/6/2001 | P | PART |
Dave Hannah
|
|
|
###-#### ok to insulate needs mec r/i c/n items completed and singed off also before cover is aproved need point loads for 2 and 3 ply girder trusses soild blocked king studs added have ? on header sizes in org house framing cotractor will check in to this 12/6/2001 2:45:47 PM
|
BLD-Footing | 10/17/2001 | 10/18/2001 | 10/18/2001 | A | PART |
Tony Young
|
|
|
###-#### or mike ###-####
wip 10/18/2001 10:46:43 AM
|