BLD-Conference | 9/16/2002 | 9/17/2002 | 9/17/2002 | P | PASS |
Tony Young
|
|
|
DAN ###-####
conf. on procedure, ok to continue 9/17/2002 2:58:34 PM
|
BLD-Conference | 9/17/2002 | 9/17/2002 | 9/17/2002 | P | PASS |
Tony Young
|
|
|
PERMIT EXTENSION PER GEORGE SLANE
|
BLD-Energy code compliance | 3/14/2002 | 3/14/2002 | 3/14/2002 | P | PASS |
Tony Young
|
|
|
###-#### rod
|
BLD-Framing/Rough-in | 3/13/2002 | 3/13/2002 | 3/13/2002 | P | PASS |
Tony Young
|
|
|
###-#### ROD
|
BLD-Framing/Rough-in | 2/11/2002 | 2/11/2002 | 2/11/2002 | P | PART |
Tony Young
|
|
|
fr insp rod- ###-####
ext. shear ok 2/11/2002 2:48:15 PM
|
BLD-Aging Inspection | 1/14/2002 | 1/14/2002 | 1/14/2002 | | PART |
Tony Young
|
|
|
wip 1/14/2002 10:45:54 AM
|
BLD-Foundation | 11/13/2001 | 11/13/2001 | 11/13/2001 | P | PART |
Tony Young
|
|
|
###-#### ROD
|
BLD-Foundation | 11/12/2001 | 11/12/2001 | 11/12/2001 | P | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/12/2001 at 09:42:10. Contact: ###-####.
|
BLD-Footing | 11/8/2001 | 11/8/2001 | 11/8/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### ROD bsmt wall & remainder of bsmt ftg. 11/8/2001 3:02:11 PM
|
BLD-Foundation | 11/1/2001 | 11/2/2001 | 11/2/2001 | A | PART |
Tom Arcoraci
|
|
|
###-#### ROD northwest wall corner 11/2/2001 11:40:41 AM
|
BLD-Footing | 10/31/2001 | 10/31/2001 | 10/31/2001 | P | PART |
Russ Owen
|
|
|
###-#### ROD . Contractor called me at 12:20 said he had poured the section that was called in for this afternoon ,was the only shot he had at concrete this day. 10/31/2001 12:39:51 PM
|
BLD-Foundation | 10/25/2001 | 10/26/2001 | 10/26/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### ROD bsmt wall portion...single form at rear. Center portion remains to be formed, horiz.dowels to be extended to tie wall together. large pipe to be removed. 10/26/2001 10:11:35 AM
|
BLD-Footing | 10/23/2001 | 10/23/2001 | 10/23/2001 | P | PART |
Dave Hannah
|
|
|
###-#### first section footing and walls will be poured in sections becouse of ext structure 10/23/2001 1:47:15 PM
|