BLD-Final | 2/6/2002 | 2/6/2002 | 2/6/2002 | P | PASS |
Steven Webb
|
|
|
###-#### GARY ACCESS TO LOCK BOX 10956 c. of c. #22154 issued. 2/6/2002 12:58:45 PM
|
BLD-Framing/Rough-in | 12/10/2001 | 12/11/2001 | 12/11/2001 | A | PART |
Steven Webb
|
|
|
###-#### ok to cover except 4 ply grider in garage-engineering or 1/2" bolts need to be installed. 12/11/2001 9:14:38 AM
|
BLD-Wall cover | 12/11/2001 | 12/11/2001 | 12/11/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 12/11/2001 10:28:52 AM Engineering on the 4 ply grider truss was provided and installation is acceptable. ok to cover 12/11/2001 10:30:03 AM
|
BLD-Framing/Rough-in | 12/6/2001 | 12/7/2001 | 12/7/2001 | P | PART |
Steven Webb
|
|
|
###-#### GARY c/n posted--ok to insulate 12/7/2001 2:25:34 PM
|
BLD-Framing/Rough-in | 12/6/2001 | 12/7/2001 | 12/7/2001 | A | CANC |
Steven Webb
|
|
|
###-#### GARY cancelled by contractor 12/7/2001 9:00:11 AM
|
BLD-Framing/Rough-in | 11/26/2001 | 11/27/2001 | 11/27/2001 | A | NR |
Steven Webb
|
|
|
###-#### GARY no plans on site 11/27/2001 9:36:39 AM
|
BLD-Framing/Rough-in | 11/27/2001 | 11/27/2001 | 11/27/2001 | P | PART |
Dave Hannah
|
|
|
###-#### shear nail ok to cover ext 11/27/2001 1:13:08 PM
|
BLD-Foundation | 10/30/2001 | 10/30/2001 | 10/30/2001 | P | PART |
Dave Hannah
|
|
|
###-#### RYAN work in progress checked rebar 10/30/2001 12:36:56 PM
|
BLD-Footing | 10/29/2001 | 10/29/2001 | 10/29/2001 | P | PASS |
Steven Webb
|
|
|
###-#### STEVE
|