BLD-Final | 3/8/2002 | 3/8/2002 | 3/8/2002 | P | PASS |
Jim Storey
|
|
|
re-insp fn fire caulking- ###-####- chris
|
BLD-Final | 3/6/2002 | 3/6/2002 | 3/6/2002 | P | FAIL |
Jim Storey
|
|
|
###-#### CHRIS fire stop grage/ all other c/n idems ok. 3/6/2002 3:29:19 PM
|
BLD-Final | 2/27/2002 | 2/27/2002 | 2/27/2002 | P | FAIL |
Russ Owen
|
|
|
chris ###-#### please call chris so he can unlock the door. c/n 2/27/2002 3:44:38 PM
|
BLD-Energy code compliance | 1/17/2002 | 1/18/2002 | 1/18/2002 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/17/2002 at 20:07:50. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/15/2002 | 1/15/2002 | 1/15/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/15/2002 at 07:23:41. Contact: ###-####. c/n made ok. 1/15/2002 2:49:27 PM
|
BLD-Framing/Rough-in | 1/10/2002 | 1/11/2002 | 1/11/2002 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/10/2002 at 20:00:16. Contact: ###-####.c/n on site ok to insulate 1/11/2002 10:38:48 AM
|
BLD-Framing/Rough-in | 11/30/2001 | 12/3/2001 | 12/3/2001 | A | PART |
Jim Storey
|
|
|
###-#### dan exterior nailling ok for cover. 12/3/2001 9:17:12 AM
|
BLD-Footing | 11/6/2001 | 11/6/2001 | 11/6/2001 | P | PASS |
Tom Arcoraci
|
|
|
###-#### TODD
|