BLD-Final | 7/17/2002 | 7/17/2002 | 7/17/2002 | P | PASS |
Jim Sly
|
|
|
BILL; Phone #: ###-#### C/C issued. 7/18/2002 3:23:47 AM
|
BLD-Energy code compliance | 5/13/2002 | 5/13/2002 | 5/13/2002 | P | PASS |
Jim Sly
|
|
|
BILL ###-####
|
BLD-Framing/Rough-in | 5/13/2002 | 5/13/2002 | 5/13/2002 | P | PASS |
Jim Sly
|
|
|
BILL ###-####
|
BLD-Framing/Rough-in | 5/9/2002 | 5/10/2002 | 5/10/2002 | A | FAIL |
Jim Sly
|
|
|
###-#### bill C/N posted. 5/10/2002 1:08:40 PM
|
BLD-Framing/Rough-in | 4/16/2002 | 4/18/2002 | 4/18/2002 | A | PART |
Jim Sly
|
|
|
shear panel- steve ###-#### Shear OK. 4/18/2002 12:47:49 PM
|
BLD-Aging Inspection | 1/14/2002 | 1/14/2002 | 1/14/2002 | | PART |
Jim Sly
|
|
|
WIP 1/14/2002 9:21:28 AM
|
BLD-Footing | 11/13/2001 | 11/14/2001 | 11/14/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/13/2001 at 15:42:49. Contact: ###-####. Footing and wall OK 11/14/2001 9:19:44 AM
|
BLD-Footing | 11/12/2001 | 11/13/2001 | 11/13/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/12/2001 at 08:54:47. Contact: ###-####.
|