BLD-Final | 4/15/2002 | 4/16/2002 | 4/16/2002 | A | PASS |
Tom Arcoraci
|
|
|
fn rick-- ###-####
|
BLD-Energy code compliance | 2/19/2002 | 2/19/2002 | 2/19/2002 | P | PASS |
Tom Arcoraci
|
|
|
RICK ###-####
|
BLD-Framing/Rough-in | 2/14/2002 | 2/15/2002 | 2/15/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 02/14/2002 at 14:56:43. Contact: ###-####. c/n 2/15/2002 10:11:48 AM
|
BLD-Framing/Rough-in | 2/4/2002 | 2/5/2002 | 2/5/2002 | A | PASS |
Steven Webb
|
|
|
SHEER NAIL RICK - ###-#### SHEAR--OK TO SIDE 2/5/2002 9:30:07 AM
|
BLD-Framing/Rough-in | 2/1/2002 | 2/4/2002 | 2/4/2002 | P | FAIL |
Steven Webb
|
|
|
SHEER PANEL RICK- ###-#### c/n posted--missing MST straps, (front of garage to second floor), nailing light at misc. locations and missing straps west of house 2/4/2002 3:12:20 PM
|
BLD-Foundation | 1/10/2002 | 1/11/2002 | 1/11/2002 | A | PART |
Steven Webb
|
|
|
###-#### wip--85% ready--Contractor provided eng. on footing as requested on approved plans by plan reviewer--pad was built per engineering, Lee Harrison (PE) was the engineer. 1/11/2002 9:49:58 AM
|
BLD-Footing | 1/9/2002 | 1/9/2002 | 1/9/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/09/2002 at 07:38:59. Contact: ###-####. 90% completed at the time of inspection. 1/9/2002 3:10:19 PM
|
BLD-Footing | 1/8/2002 | 1/8/2002 | 1/8/2002 | P | CANC |
Steven Webb
|
|
|
###-#### cancelled by contractor 1/8/2002 11:12:20 AM
|