BLD-Final | 6/21/2002 | 6/21/2002 | 6/21/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/21/2002 at 07:28:43. Contact: ###-####. C. of C. #22476 issued. 6/21/2002 2:46:38 PM
|
BLD-Grading Inspection | 6/21/2002 | 6/21/2002 | 6/21/2002 | | BOND |
Rita DeYoung
|
|
|
Final grading is approved upon receipt of a $1000.00 bond for the completion of the revegetation.
|
BLD-Final | 6/13/2002 | 6/14/2002 | 6/14/2002 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 06/13/2002 at 14:44:57. Contact: ###-####.
c/n posted 6/14/2002 2:53:49 PM
|
BLD-Concrete | 4/12/2002 | 4/15/2002 | 4/15/2002 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 04/12/2002 at 16:54:25. Contact: ###-####. post support piers and short walls each side of concrete patio front of building 4/15/2002 10:45:12 AM
|
BLD-Wall cover | 3/7/2002 | 3/7/2002 | 3/7/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/07/2002 at 08:39:01. Contact: ###-####. ok to cover interior.front porch roof not framed. 3/7/2002 2:01:30 PM
|
BLD-Wall cover | 3/4/2002 | 3/5/2002 | 3/5/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 12:27:31. Contact: ###-####. ok to cover needs letter from eng for change to gyp shear for some int walls instead of osb 3/5/2002 11:39:58 AM
|
BLD-Wall cover | 3/1/2002 | 3/4/2002 | 3/4/2002 | A | FAIL |
Carl Dependahl
|
|
|
Jim Story gave the c/n, prefers to have him back ###-#### c/n, firestops, complete gypsum thru overhangs, etc..remove insul at common walls for reinsp. 3/4/2002 11:08:10 AM
|
BLD-Wall cover | 2/28/2002 | 3/1/2002 | 3/1/2002 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/28/2002 at 16:33:01. Contact: ###-####...keep c/n re firewalls , etc. 3/1/2002 2:52:08 PM
|
BLD-Energy code compliance | 2/26/2002 | 2/26/2002 | 2/26/2002 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/26/2002 at 09:18:26. Contact: ###-####.
|
BLD-Wall cover | 2/26/2002 | 2/26/2002 | 2/26/2002 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/26/2002 at 09:19:12. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/20/2002 | 2/21/2002 | 2/21/2002 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 02/20/2002 at 23:47:22. Contact: ###-####. c/n posted 2/21/2002 11:32:21 AM
|
BLD-Framing/Rough-in | 2/20/2002 | 2/20/2002 | 2/20/2002 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/20/2002 at 07:35:22. Contact: ###-####.
|
BLD-Other | 2/15/2002 | 2/15/2002 | 2/15/2002 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 02/15/2002 at 07:29:49. Contact: ###-####.
|
BLD-Other | 1/18/2002 | 1/18/2002 | 1/18/2002 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/18/2002 at 08:38:52. Contact: ###-####. ext shear walls ok to cover 1/18/2002 3:20:21 PM
|
BLD-Other | 1/16/2002 | 1/17/2002 | 1/17/2002 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/16/2002 at 13:48:49. Contact: ###-####.c/n posted on shear 1/17/2002 11:34:26 AM
|
BLD-Other | 1/15/2002 | 1/15/2002 | 1/15/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/15/2002 at 06:38:38. Contact: ###-####. shear panels need to add nails to ones on front of house needs to add straps over garage and get eng or add hold downs at corners both ends of garage 1/15/2002 2:07:47 PM
|
BLD-Other | 1/7/2002 | 1/7/2002 | 1/7/2002 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/07/2002 at 06:07:06. Contact: ###-####.upper firewall ok to stand after finish nailing off 1/7/2002 11:28:27 AM
|
BLD-Other | 12/27/2001 | 12/28/2001 | 12/28/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/27/2001 at 15:05:43. Contact: ###-####.main level firewall ok to stand 12/28/2001 10:43:17 AM
|
BLD-Foundation | 12/10/2001 | 12/11/2001 | 12/11/2001 | A | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Footing | 12/3/2001 | 12/3/2001 | 12/3/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/03/2001 at 08:21:00. Contact: ###-####.
|
BLD-Footing | 11/28/2001 | 11/28/2001 | 11/28/2001 | P | CANC |
|
|
|
Scheduled by a contractor via Hello! on 11/28/2001 at 10:09:33. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 11/28/2001 at 10:49:40.
|