Permit Information
Permit NumberBLD01-02822
StatusFinaled
Name E H CONSTRUCTION
Site Address 1433 -35 E HAYS ST
Project NameHILLSIDE-CATEGORY 3
Customer Number 
ePlanReviewNo
Description
To construct a 3298 sq. ft. two story duplex per approved plans, all engineering/red lining and attached requirement lists. Each unit will be 1649 sq. ft. with 398 sq. ft. finished basement, a 400 sq. ft. attached two car garage, a 86 sq. ft. covered concrete entry porch, a 80 sq. ft. covered 2nd level deck off bedroom three and a 25 sq. ft. 2nd level deck off master suite. (1st floor 810 sq. ft.)(2nd floor 839 sq. ft.) This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and 30 ft. defensible area will be required. Fire sprinklers are not required per Dave Miller/Sam Rogers (11-09-01). THE CONSTRUCTION OF THE DWELLING UNIT SEPERATION WALLS ARE DESIGNED TO MEET TOWNHOUSE CONSTRUCTION. Note: Conversion permits and either a recorded subdivision, a zoning certificate or a record of survey must be completed prior to selling as individual units. See comment for additional requirements for townhouse wall inspections. PC #768 CAA #01-00213 DJO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/21/20026/21/20026/21/2002PPASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 06/21/2002 at 07:28:43. Contact: ###-####. C. of C. #22476 issued. 6/21/2002 2:46:38 PM
BLD-Grading Inspection6/21/20026/21/20026/21/2002 BOND
DetailsRita DeYoung
Final grading is approved upon receipt of a $1000.00 bond for the completion of the revegetation.
BLD-Final6/13/20026/14/20026/14/2002PFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 06/13/2002 at 14:44:57. Contact: ###-####.
c/n posted 6/14/2002 2:53:49 PM
BLD-Concrete4/12/20024/15/20024/15/2002PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 04/12/2002 at 16:54:25. Contact: ###-####. post support piers and short walls each side of concrete patio front of building 4/15/2002 10:45:12 AM
BLD-Wall cover3/7/20023/7/20023/7/2002PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/07/2002 at 08:39:01. Contact: ###-####. ok to cover interior.front porch roof not framed. 3/7/2002 2:01:30 PM
BLD-Wall cover3/4/20023/5/20023/5/2002APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 03/04/2002 at 12:27:31. Contact: ###-####. ok to cover needs letter from eng for change to gyp shear for some int walls instead of osb 3/5/2002 11:39:58 AM
BLD-Wall cover3/1/20023/4/20023/4/2002AFAIL
DetailsCarl Dependahl
Jim Story gave the c/n, prefers to have him back ###-#### c/n, firestops, complete gypsum thru overhangs, etc..remove insul at common walls for reinsp. 3/4/2002 11:08:10 AM
BLD-Wall cover2/28/20023/1/20023/1/2002ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/28/2002 at 16:33:01. Contact: ###-####...keep c/n re firewalls , etc. 3/1/2002 2:52:08 PM
BLD-Energy code compliance2/26/20022/26/20022/26/2002PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/26/2002 at 09:18:26. Contact: ###-####.
BLD-Wall cover2/26/20022/26/20022/26/2002PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/26/2002 at 09:19:12. Contact: ###-####.
BLD-Framing/Rough-in2/20/20022/21/20022/21/2002AFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 02/20/2002 at 23:47:22. Contact: ###-####. c/n posted 2/21/2002 11:32:21 AM
BLD-Framing/Rough-in2/20/20022/20/20022/20/2002PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/20/2002 at 07:35:22. Contact: ###-####.
BLD-Other2/15/20022/15/20022/15/2002ANR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 02/15/2002 at 07:29:49. Contact: ###-####.
BLD-Other1/18/20021/18/20021/18/2002PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 01/18/2002 at 08:38:52. Contact: ###-####. ext shear walls ok to cover 1/18/2002 3:20:21 PM
BLD-Other1/16/20021/17/20021/17/2002AFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 01/16/2002 at 13:48:49. Contact: ###-####.c/n posted on shear 1/17/2002 11:34:26 AM
BLD-Other1/15/20021/15/20021/15/2002PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 01/15/2002 at 06:38:38. Contact: ###-####. shear panels need to add nails to ones on front of house needs to add straps over garage and get eng or add hold downs at corners both ends of garage 1/15/2002 2:07:47 PM
BLD-Other1/7/20021/7/20021/7/2002APART
DetailsTony Young
Scheduled by a contractor via Hello! on 01/07/2002 at 06:07:06. Contact: ###-####.upper firewall ok to stand after finish nailing off 1/7/2002 11:28:27 AM
BLD-Other12/27/200112/28/200112/28/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 12/27/2001 at 15:05:43. Contact: ###-####.main level firewall ok to stand 12/28/2001 10:43:17 AM
BLD-Foundation12/10/200112/11/200112/11/2001APASS
DetailsRuss Owen
###-####
BLD-Footing12/3/200112/3/200112/3/2001PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/03/2001 at 08:21:00. Contact: ###-####.
BLD-Footing11/28/200111/28/200111/28/2001PCANC
Scheduled by a contractor via Hello! on 11/28/2001 at 10:09:33. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 11/28/2001 at 10:49:40.