BLD-Final | 3/7/2002 | 3/7/2002 | 3/7/2002 | P | PASS |
Russ Owen
|
|
|
###-#### JUSTIN
|
BLD-Energy code compliance | 1/10/2002 | 1/10/2002 | 1/10/2002 | P | PASS |
Jim Storey
|
|
|
justin ###-#### ok 1/10/2002 3:39:59 PM
|
BLD-Framing/Rough-in | 1/7/2002 | 1/7/2002 | 1/7/2002 | P | PASS |
Jim Storey
|
|
|
fr insp ###-####- justin
|
BLD-Framing/Rough-in | 1/2/2002 | 1/2/2002 | 1/2/2002 | P | PART |
Jim Storey
|
|
|
SHEER INSPECTION JUSTIN ###-#### c/n made ok 1/2/2002 3:39:34 PM
|
BLD-Framing/Rough-in | 12/18/2001 | 12/19/2001 | 12/19/2001 | A | PART |
Dave Hannah
|
|
|
###-#### sheer inspect ok to cover ext need to check hold downs by front door make sure bolts have been tightened 12/19/2001 11:09:05 AM
|
BLD-Foundation | 12/3/2001 | 12/3/2001 | 12/3/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/03/2001 at 07:23:15. Contact: ###-####.
|
BLD-Footing | 11/30/2001 | 11/30/2001 | 11/30/2001 | P | PASS |
Jim Storey
|
|
|
###-#### ERIC
|