Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-02875
StatusFinaled
Name BRADALL ASSOCIATES LTD
Site Address 7100 W STATE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(ALBERTSONS #156) To remodel the entire 43368 sq ft retail grocery store no additional area is being added. Work will include, removal of the entire suspended ceiling and hanging partitions, removal of flooring and interior finishes, addition of new walk-in cooler units, all new interior finishes, construction of new one-hour grease duct shaft, installation of type-one hood system, new suspended ceiling, lighting, mechanical, electrical and plumbing, new exterior metal roof on existing canopy. This building is fully fire sprinklered any alterations or modifications to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department. (#pc834-01) *RmH*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference12/18/200312/19/200312/19/2003ADONE
DetailsTony Young
conference on final project if we need anythig more, #415 to do
BLD-Final9/3/20029/4/20029/4/2002APASS
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
ok for l of c 9/4/2002 10:52:49 AM
BLD-Other6/10/20026/11/20026/11/2002APART
DetailsTony Young
Scheduled by a contractor via Hello! on 06/10/2002 at 12:09:24. Contact: ###-####.
shaft in bakery ok 6/11/2002 10:41:21 AM
BLD-Framing/Rough-in5/10/20025/13/20025/13/2002APART
DetailsTony Young
bakery production room -gil ###-####
maintain fire blocks at ceiling line where comb. materials exist, ok to cover soffit area 5/13/2002 10:54:15 AM
BLD-Framing/Rough-in4/16/20024/16/20024/16/2002PPART
DetailsTony Young
fr keith ###-####
pony wall for florar area, cash room ok to cover 4/16/2002 4:14:30 PM
BLD-Conference3/5/20023/5/20023/5/2002APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 3/5/2002 9:00:32 AM w/ keith at site re fireblocking...draftstops
BLD-Framing/Rough-in3/1/20023/4/20023/4/2002ANR
DetailsTony Young
Scheduled by Inspector: 340 On 3/1/2002 5:10:43 PM 8634858...go to trailer
BLD-Framing/Rough-in3/4/20023/4/20023/4/2002PPART
DetailsTony Young
bath rooms ok to cover 3/4/2002 4:18:23 PM
BLD-Framing/Rough-in3/1/20023/1/20023/1/2002PNR
DetailsCarl Dependahl
###-#### go to the construction trailer