BLD-Final | 2/13/2002 | 2/13/2002 | 2/13/2002 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 02/13/2002 at 07:29:11. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/27/2001 | 12/27/2001 | 12/27/2001 | A | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/27/2001 at 07:29:31. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/27/2001 | 12/27/2001 | 12/27/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/27/2001 at 11:01:30. Contact: ###-####.
ok to insulate, need to meet egress in master bedroom, and pass on gas test 12/27/2001 12:30:11 PM
|
BLD-Framing/Rough-in | 12/26/2001 | 12/26/2001 | 12/26/2001 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/26/2001 at 11:24:12. Contact: ###-####.Needs electrical permit and inspection,also needs mec inspection also foam seal not done. c/n posted. 12/26/2001 3:26:39 PM
|
BLD-Framing/Rough-in | 12/14/2001 | 12/17/2001 | 12/17/2001 | A | PART |
Tony Young
|
|
|
BILL ###-#### SHEER WALL
ext. shear ok 12/17/2001 11:34:00 AM
|
BLD-Framing/Rough-in | 12/14/2001 | 12/14/2001 | 12/14/2001 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/14/2001 at 07:14:59. Contact: ###-####.
c/n posted on shear 12/14/2001 10:37:48 AM
|
BLD-Foundation | 11/30/2001 | 12/3/2001 | 12/3/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/30/2001 at 15:17:22. Contact: ###-####.ftgs poured, appears ok, wall ok 12/3/2001 10:53:43 AM
|
BLD-Footing | 11/30/2001 | 11/30/2001 | 11/30/2001 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/30/2001 at 09:23:11. Contact: ###-####.
|