BLD-Final | 7/10/2002 | 7/11/2002 | 7/11/2002 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/10/2002 at 16:49:10. Contact: ###-####.
|
BLD-Energy code compliance | 1/3/2002 | 1/4/2002 | 1/4/2002 | A | PART |
Russ Owen
|
|
|
###-#### Ok to sheetrock upper area only basement needs fire blocking c/n posetd. 1/4/2002 12:45:02 PM
|
BLD-Framing/Rough-in | 12/31/2001 | 1/2/2002 | 1/2/2002 | A | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 12/31/2001 at 14:02:46. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/28/2001 | 12/31/2001 | 12/31/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/28/2001 at 13:47:21. Contact: ###-####.c/n posted 12/31/2001 11:29:10 AM
|
BLD-Footing | 11/27/2001 | 11/28/2001 | 11/28/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/27/2001 at 11:55:15. Contact: ###-####.
ftg and wall poured 11/28/2001 11:48:28 AM
|