BLD-Final | 1/23/2002 | 1/24/2002 | 1/24/2002 | A | PASS |
Jim Sly
|
|
|
###-#### C/C issued. 1/24/2002 10:30:08 AM
|
BLD-Framing/Rough-in | 12/20/2001 | 12/21/2001 | 12/21/2001 | A | PASS |
Jim Sly
|
|
|
###-#### Energy OK. 12/21/2001 11:54:02 AM
|
BLD-Energy code compliance | 12/14/2001 | 12/17/2001 | 12/17/2001 | A | PASS |
Dave Hannah
|
|
|
###-#### framing ok but still needs to add stapels back wall shear panel 12/17/2001 9:46:34 AM
|
BLD-Framing/Rough-in | 12/12/2001 | 12/13/2001 | 12/13/2001 | A | CANC |
Jim Sly
|
|
|
###-#### NR 12/13/2001 11:18:37 AM
|
BLD-Framing/Rough-in | 12/12/2001 | 12/12/2001 | 12/12/2001 | P | FAIL |
Jim Sly
|
|
|
DAVE ###-#### C/N posted. 12/12/2001 3:00:37 PM
|
BLD-Foundation | 11/6/2001 | 11/7/2001 | 11/7/2001 | A | PART |
Jim Sly
|
|
|
###-#### JAMES
|
BLD-Footing | 11/6/2001 | 11/6/2001 | 11/6/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/06/2001 at 06:36:28. Contact: ###-####.
|