BLD-Final | 8/8/2002 | 8/9/2002 | 8/9/2002 | A | PASS |
Jim Sly
|
|
|
needs to be finaled builder will call you. CALL HOME OWNER 1ST AT ###-#### TOM OR STEPHANIE C/C issued. 8/9/2002 11:04:53 AM
|
BLD-Energy code compliance | 1/21/2002 | 1/22/2002 | 1/22/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/21/2002 at 14:54:59. Contact: ###-####. Frame OK. 1/22/2002 12:21:33 PM
|
BLD-Framing/Rough-in | 1/17/2002 | 1/18/2002 | 1/18/2002 | A | FAIL |
Jim Sly
|
|
|
John, ###-#### : ) C/N posted. 1/18/2002 11:13:21 AM
|
BLD-Framing/Rough-in | 1/8/2002 | 1/9/2002 | 1/9/2002 | P | PART |
Dave Hannah
|
|
|
SHEER NAIL JOHN ###-#### ok to cover ext but need to retro fit two hold downs along back garage wall one at south side of door and the other on the north side of mec bock out see city approved plans 1/9/2002 1:16:42 PM
|
BLD-Final | 11/27/2001 | 11/27/2001 | 11/27/2001 | P | FAIL |
Jim Sly
|
|
|
###-#### JANI Should have been found insp.....arrived late PM (because I thought final.....) Poured W/O inspection....Contr did not try to call me before pouring. 11/27/2001 4:06:04 PM
|
BLD-Foundation | 11/20/2001 | 11/21/2001 | 11/21/2001 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/20/2001 at 07:23:52. Contact: ###-####.
|
BLD-Footing | 11/20/2001 | 11/20/2001 | 11/20/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/20/2001 at 08:54:35. Contact: ###-####.
|
BLD-Footing | 11/20/2001 | 11/20/2001 | 11/20/2001 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/20/2001 at 07:23:00. Contact: ###-####.
|