Permit Information
Permit NumberBLD01-02944
StatusExpired
Name WOODMAN RANDY L
Site Address 1611 N 19TH ST
Project NameSTRAW BALE NON SUPPORTING
Customer Number 
ePlanReviewNo
Description
This project is for an addition of 856s.f. to an existing 633s.f. single family dwelling. The addition is to be constructed using an alternate design method per 1997 Uniform Building Code Section 104.2.8 approved by the Building Department Director Tim Hogland. The method is to construct a fully engineered self supporting structural frame with straw bales used for exterior wall infill, using the Boise City Straw Bale Construction Requirements (effective 9-13-2001). Smoke detectors per UBC 310.9 are required along with separate electrical, plumbing, and mechanical permits. R-1C setbacks ok per rhj. All work to be per the approved plans as marked and attached engineering, engineering calculations, and conditions list. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD - Request for Extension6/4/20036/5/20036/5/2003APASS
DetailsDave Hannah
###-#### randy ok to extend 6/5/2003 10:50:34 AM
BLD-Conference10/24/200210/25/200210/25/2002APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 10/24/2002 at 10:20:00. Contact: ###-####.
ok to stucco out side exterior 10/25/2002 10:52:07 AM
BLD-Framing/Rough-in6/14/20026/17/20026/17/2002PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 06/14/2002 at 10:42:10. Contact: ###-####.
ok to start on straw bales,, elec. to be done later 6/17/2002 4:24:37 PM
BLD-Framing/Rough-in6/3/20026/4/20026/4/2002PCANC
DetailsTony Young
Scheduled by a contractor via Hello! on 06/03/2002 at 13:04:58. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 06/04/2002 at 07:26:15.
BLD-Conference5/6/20025/7/20025/7/2002PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 05/06/2002 at 14:59:03. Contact: ###-####.
on framing 5/7/2002 3:19:27 PM
BLD-Conference4/9/20024/9/20024/9/2002PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 04/09/2002 at 10:06:57. Contact: ###-####.
conf. on framing issues 4/9/2002 1:33:11 PM
BLD-Conference3/1/20023/1/20023/1/2002PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/01/2002 at 10:05:29. Contact: ###-####. 3/1/2002 4:51:39 PM Verified frost protection a slab insulation ok. 3/1/2002 4:52:01 PM
BLD-Foundation1/31/20022/1/20022/1/2002APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/31/2002 at 11:31:26. Contact: ###-####.
BLD-Conference1/16/20021/18/20021/18/2002APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 01/16/2002 at 15:55:27. Contact: ###-####.conf. on ftgs 1/18/2002 12:11:12 PM
BLD-Foundation1/16/20021/18/20021/16/2002ACANC
DetailsTony Young
Scheduled by a contractor via Hello! on 01/16/2002 at 15:48:21. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 01/16/2002 at 15:54:00.
BLD-Conference12/19/200112/20/200112/20/2001APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 12/19/2001 at 12:57:23. Contact: ###-####.///straw bale addition, trench ok for road-mix per plan 12/20/2001 11:18:17 AM