BLD-Final | 7/23/2002 | 7/23/2002 | 7/23/2002 | P | PASS |
Dave Hannah
|
|
|
###-#### mti o site to test conc and inspect rebar 7/23/2002 4:27:05 PM
|
BLD-Final | 7/15/2002 | 7/16/2002 | 7/16/2002 | A | FAIL |
Dave Hannah
|
|
|
received card -###-####- bob says he has a yellow sticker stating job has been signed off but I do not see that in his building permit activities needs plm final insulation in crawel space put back in place and dryer vent changed to smooth duct 7/16/2002 11:20:00 AM
|
BLD-Energy code compliance | 1/10/2002 | 1/10/2002 | 1/10/2002 | P | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 1/10/2002 2:55:43 PM
|
BLD-Final | 1/9/2002 | 1/10/2002 | 1/10/2002 | P | NR |
Dave Hannah
|
|
|
###-####
|
BLD-Framing/Rough-in | 1/10/2002 | 1/10/2002 | 1/10/2002 | P | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 1/10/2002 2:56:11 PM
|
BLD-Framing/Rough-in | 12/6/2001 | 12/7/2001 | 12/7/2001 | P | PART |
Dave Hannah
|
|
|
###-#### OR ###-#### shear ok to cover ext 12/6/2001 4:05:03 PM
|
BLD-Foundation | 11/29/2001 | 11/30/2001 | 11/29/2001 | A | CANC |
Dave Hannah
|
|
|
fd-- bob -###-#### cancel per bob hathaway already had insp
|
BLD-Footing | 11/19/2001 | 11/20/2001 | 11/20/2001 | P | PASS |
Dave Hannah
|
|
|
###-#### GRANT
|