BLD-Final | 1/23/2003 | 1/27/2003 | 1/24/2003 | A | CANC |
Russ Owen
|
|
|
john- ###-####--pending fire-fn occ Inspection cancelled from web by: Rita DeYoung
|
FIRE-Final Inspection | 1/23/2003 | 1/24/2003 | 1/24/2003 | A | FAIL |
Troy Cobbley
|
|
|
Phone #: ###-#### Provide signage on the fire riser door and provide Knox Box 1/24/2003 9:55:45 AM
|
BLD-Framing/Rough-in | 1/28/2002 | 1/28/2002 | 1/28/2002 | P | PART |
Russ Owen
|
|
|
celling grid john ###-####needs addnl perimeter wires 1/29/2002 1:31:57 PM
|
FIRE-Sprinkler Rough-in | 1/23/2002 | 1/24/2002 | 1/24/2002 | A | FAIL |
Troy Cobbley
|
|
|
Provide smoke detector, manual pull station and horn/strobe on the fire alarm system as well as 60 hour backupwith dual phone lines. Submitt plans to City of Boise. If panel is replaced HVAC units may need to be monitored. Provide exit sign at required exit, provide approved door hardware, provide tagged fire extinguishers mounted with handles at 48", provide heat in riser room (remove heat tape) and provide current inspection tag on riser. 1/24/2002 7:24:21 PM
|
BLD-Framing/Rough-in | 1/8/2002 | 1/9/2002 | 1/9/2002 | A | PART |
Russ Owen
|
|
|
STE C ###-#### JOHN. ok to rock, after ele,plm approvals. 1/9/2002 1:06:15 PM
|
BLD-Framing/Rough-in | 1/3/2002 | 1/3/2002 | 1/3/2002 | P | PART |
Russ Owen
|
|
|
###-#### Conference on exiting. 1/3/2002 3:00:24 PM
|