BLD-Final | 2/6/2002 | 2/7/2002 | 2/7/2002 | A | PASS |
Jim Sly
|
|
|
DAVE ###-#### C/C issued. 2/7/2002 10:25:31 AM
|
BLD-Energy code compliance | 1/4/2002 | 1/8/2002 | 1/8/2002 | A | PASS |
Jim Sly
|
|
|
dave ###-####
|
BLD-Framing/Rough-in | 1/4/2002 | 1/8/2002 | 1/8/2002 | A | PASS |
Jim Sly
|
|
|
fr dave ###-####
|
BLD-Framing/Rough-in | 1/4/2002 | 1/4/2002 | 1/4/2002 | P | FAIL |
Jim Sly
|
|
|
###-#### C/N on site. 1/4/2002 12:54:44 PM
|
BLD-Footing | 12/3/2001 | 12/5/2001 | 12/5/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/03/2001 at 07:34:22. Contact: ###-####. Foundation Pass. 12/4/2001 1:33:05 PM
|
BLD-Foundation | 12/3/2001 | 12/4/2001 | 12/4/2001 | A | PASS |
Jim Sly
|
|
|
###-####
|