BLD-Final | 7/18/2002 | 7/18/2002 | 7/18/2002 | A | PASS |
Steven Webb
|
|
|
C. of C. #22467 issued. 7/18/2002 11:09:09 AM
|
BLD-Final | 7/16/2002 | 7/17/2002 | 7/17/2002 | A | FAIL |
Steven Webb
|
|
|
robert 861 7/17/2002 8:49:28 AM C/N--Rim joist needs insulation and seal behind elec. outlet--outside walls. 7/17/2002 10:15:24 AM
|
BLD-Final | 7/17/2002 | 7/17/2002 | 7/17/2002 | P | NR |
Steven Webb
|
|
|
BOB; Phone #: ###-####
|
BLD-Final | 7/10/2002 | 7/10/2002 | 7/10/2002 | P | FAIL |
Steven Webb
|
|
|
###-#### robert C/N issued. 7/10/2002 4:21:31 PM
|
BLD-Framing/Rough-in | 2/22/2002 | 2/22/2002 | 2/22/2002 | P | PASS |
Jim Sly
|
|
|
###-####- bob fr
|
BLD-Framing/Rough-in | 2/20/2002 | 2/20/2002 | 2/20/2002 | P | PART |
Jim Storey
|
|
|
###-#### ROBERT supply truss enginring to change bearing wall to east side of hallway or add header and support. 2/20/2002 4:05:30 PM
|
BLD-Wall cover | 2/18/2002 | 2/19/2002 | 2/19/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 15:08:31. Contact: .
|
BLD-Foundation | 1/17/2002 | 1/17/2002 | 1/17/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/17/2002 at 07:26:37. Contact: ###-####. wip-20%completed at the time of inspection. 1/17/2002 2:44:40 PM
|
BLD-Foundation | 1/15/2002 | 1/16/2002 | 1/16/2002 | A | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/15/2002 at 19:56:28. Contact: ###-####. Contr Cancelled. 1/16/2002 10:33:02 AM
|
BLD-Footing | 1/14/2002 | 1/15/2002 | 1/15/2002 | A | PART |
Steven Webb
|
|
|
###-#### wip 1/15/2002 9:35:55 AM
|
BLD-Footing | 1/14/2002 | 1/14/2002 | 1/14/2002 | P | CANC |
Steven Webb
|
|
|
###-#### cancelled by contractor 1/14/2002 2:36:40 PM
|