Permit NumberBLD01-03082
StatusFinaled
Name BOISE CITY PUBLIC LIBRARY
Site Address 715 S CAPITOL BLVD
Project NameBOISE CITY PUBLIC LIBRARY
Customer Number 
ePlanReviewNo
Description
(BOISE CITY PUBLIC LIBRARY) This building is fire sprinklered to substitute for 1-hr fire-resistive construction. To perform elevator, fire alarm, and security upgrades to the Boise City Public Library. Work is to include new storefront doors, new doorways in front elevator shaft #1 at the 2nd and 3rd floors, new smoke control doors on all doorways in front elevator shaft #1, upgrades to the elevator machine room, security upgrades to selected doors, and the modernization of two elevators all per approved drawings and plan review conditions on file. Fire sprinkler heads affected by new construction shall be located to comply with NFPA 13-1999 as regulated by the Fire Department. This building has NOT been analyzed for code compliance. This permit does NOT establish a Certificate of Occupancy for the building. PC01-0887 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/5/20036/6/20036/6/2003APASS
DetailsDave Hannah
###-#### pat
BLD-Final6/4/20036/5/20036/5/2003ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/4/2003 at 3:04:54 PM. Contact: ###-####.
BLD-Final6/3/20036/4/20036/4/2003PCANC
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 6/3/2003 at 8:12:00 AM. Contact: ###-####....need fire 1st 6/4/2003 3:38:02 PM
FIRE-Final Inspection6/3/20036/4/20036/4/2003APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 6/3/2003 at 8:10:19 AM. Contact: ###-####.
BLD-Conference10/14/200210/14/200210/14/2002PCANC
DetailsCarl Dependahl
BLD-Conference10/14/200210/14/200210/14/2002PPASS
DetailsCarl Dependahl
Verbal c/n: seal shaft wall at elev doors, add air inlet at mach rm...SFDampers reqd at mach rm.
BLD-Framing/Rough-in10/10/200210/11/200210/11/2002APART
DetailsCarl Dependahl
pat; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...walls ok,..need to verify "seal" at new shaft openings. Mach. rm framing ok, seal/patch gyp at all lid perimeters 10/11/02 11:39:53 AM