BLD-Final | 3/15/2002 | 3/18/2002 | 3/18/2002 | P | PASS |
Jim Storey
|
|
|
jeff - ###-#### re-insp fn c/n made ok final isued. 3/18/2002 2:39:11 PM
|
BLD-Final | 3/14/2002 | 3/15/2002 | 3/15/2002 | P | FAIL |
Dave Hannah
|
|
|
fn jeff- ###-#### needs smoke det down stair hallway and fire caulk gas and elec as per mec c/n 3/15/2002 4:11:25 PM
|
BLD-Final | 1/30/2002 | 1/31/2002 | 1/31/2002 | P | NR |
Jim Storey
|
|
|
fn grant ###-####
|
BLD-Energy code compliance | 1/15/2002 | 1/16/2002 | 1/16/2002 | A | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Energy code compliance | 1/15/2002 | 1/16/2002 | 1/16/2002 | A | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Framing/Rough-in | 1/14/2002 | 1/15/2002 | 1/15/2002 | A | PART |
Dave Hannah
|
|
|
###-#### c/n on site ok to insulate 1/15/2002 11:13:41 AM
|
BLD-Framing/Rough-in | 12/20/2001 | 12/21/2001 | 12/21/2001 | A | PASS |
Steven Webb
|
|
|
shear ###-#### ok to side 12/21/2001 8:22:00 AM
|
BLD-Foundation | 12/4/2001 | 12/5/2001 | 12/5/2001 | A | PART |
Jim Storey
|
|
|
###-#### JOHN pw/o insp. 12/5/2001 1:09:09 PM
|
BLD-Footing | 12/4/2001 | 12/4/2001 | 12/4/2001 | P | PASS |
Jim Storey
|
|
|
###-#### ft ok 12/4/2001 3:05:48 PM
|