BLD-Final | 4/2/2002 | 4/3/2002 | 4/3/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/02/2002 at 17:45:21. Contact: ###-####. c 4/3/2002 11:07:55 AM
|
BLD-Final | 4/1/2002 | 4/2/2002 | 4/2/2002 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/01/2002 at 14:37:23. Contact: ###-####. c/n--handrail at house and garage--completed area for shut-off at fireplace. 4/2/2002 3:12:37 PM
|
BLD-Energy code compliance | 1/30/2002 | 1/31/2002 | 1/31/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/30/2002 at 11:36:18. Contact: ###-####. c/n made ok. 1/31/2002 10:47:41 AM
|
BLD-Framing/Rough-in | 1/29/2002 | 1/29/2002 | 1/29/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/29/2002 at 11:09:28. Contact: ###-####. Most items on 1-28-02 c/n are completed-2 are not--ok to insulate--will verify at energy these two items. 1/29/2002 1:12:04 PM
|
BLD-Framing/Rough-in | 1/28/2002 | 1/28/2002 | 1/28/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/28/2002 at 10:54:55. Contact: ###-####.c/n on site 1/28/2002 1:56:39 PM
|
BLD-Framing/Rough-in | 1/16/2002 | 1/16/2002 | 1/16/2002 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/16/2002 at 08:37:05. Contact: ###-####.ok to cover ext walls still needs retro hold downs checked framing 1/16/2002 2:37:57 PM
|
BLD-Framing/Rough-in | 1/15/2002 | 1/15/2002 | 1/15/2002 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/15/2002 at 09:08:54. Contact: ###-####. c/n posted--staples light and penetration excessive--missing hd's at front--retrofit--will verify at framing. do not side. 1/15/2002 3:02:01 PM
|
BLD-Foundation | 12/17/2001 | 12/18/2001 | 12/18/2001 | A | PART |
Jim Storey
|
|
|
###-####
|
BLD-Footing | 12/13/2001 | 12/13/2001 | 12/13/2001 | P | PART |
Steven Webb
|
|
|
###-#### wip- 12/13/2001 2:11:05 PM
|