BLD-Final | 5/1/2002 | 5/1/2002 | 5/1/2002 | P | PASS |
Tom Arcoraci
|
|
|
###-#### JUSTIN
|
BLD-Energy code compliance | 3/11/2002 | 3/11/2002 | 3/11/2002 | P | PASS |
Jim Storey
|
|
|
justin ###-#### energy code insp
|
BLD-Framing/Rough-in | 3/4/2002 | 3/5/2002 | 3/5/2002 | A | PASS |
Dave Hannah
|
|
|
###-#### ok to insulate 3/5/2002 10:56:57 AM
|
BLD-Framing/Rough-in | 3/1/2002 | 3/1/2002 | 3/1/2002 | P | NR |
Steven Webb
|
|
|
justin ###-#### need mechanical r.i. 3/1/2002 3:15:31 PM
|
BLD-Framing/Rough-in | 2/28/2002 | 2/28/2002 | 2/28/2002 | P | NR |
Jim Storey
|
|
|
###-####
|
BLD-Framing/Rough-in | 2/26/2002 | 2/26/2002 | 2/26/2002 | P | PART |
Jim Storey
|
|
|
garage shear ###-#### ok all but 16 ft door pannels 2/26/2002 3:19:27 PM
|
BLD-Foundation | 2/18/2002 | 2/19/2002 | 2/19/2002 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 07:50:02. Contact: ###-####. OK except placement of all HD's per cond 1:16 ....Discussed with conc contr. (ie...exactly per Eng.) 2/19/2002 10:38:29 AM
|
BLD-Framing/Rough-in | 2/15/2002 | 2/19/2002 | 2/19/2002 | A | PART |
Jim Sly
|
|
|
shear- ###-####- justin Ext shear OK.....Talked to framer about adding blocks for seams of Int shear panels per "2" conditions. 2/19/2002 10:36:28 AM
|
BLD-Footing | 2/15/2002 | 2/15/2002 | 2/15/2002 | P | PART |
Jim Storey
|
|
|
ft insp ###-####- eric wip 2/15/2002 1:17:52 PM
|
BLD-Foundation | 12/20/2001 | 12/20/2001 | 12/20/2001 | P | PART |
Jim Storey
|
|
|
###-#### wip 12/20/2001 1:19:48 PM
|
BLD-Footing | 12/14/2001 | 12/14/2001 | 12/14/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/14/2001 at 07:50:13. Contact: ###-####.
|