BLD-Aging Inspection | 12/16/2003 | 12/16/2003 | 12/16/2003 | | PASS |
Jim Storey
|
|
|
expired no call for reinsp. 12/16/2003 9:29:24 AM
|
FIRE-Final Inspection | 3/22/2002 | 3/22/2002 | 3/22/2002 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 3/22/2002 1:33:11 PM
|
BLD-Final | 3/21/2002 | 3/21/2002 | 3/21/2002 | P | FAIL |
Jim Storey
|
|
|
###-#### ROD need fire chalking under rated counter top bothsides/ trip test. 3/21/2002 3:36:03 PM
|
BLD-Wall cover | 2/12/2002 | 2/13/2002 | 2/13/2002 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/12/2002 at 13:58:37. Contact: .
|
FIRE-Conference | 2/13/2002 | 2/13/2002 | 2/13/2002 | P | PART |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 2/13/2002 10:49:07 AM 2 pm with Duane met with Duane and the fire door will have a fusible link per UBC 713.2 requirements 2/13/2002 3:33:46 PM
|
BLD-Wall cover | 2/11/2002 | 2/12/2002 | 2/12/2002 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/11/2002 at 15:14:01. Contact: . no contact number. 2/12/2002 2:13:19 PM
|
BLD-Wall cover | 2/8/2002 | 2/11/2002 | 2/11/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/08/2002 at 16:25:42. Contact: .
|
BLD-Framing/Rough-in | 2/6/2002 | 2/6/2002 | 2/6/2002 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/06/2002 at 08:09:49. Contact: . c/n posted 2/6/2002 2:59:57 PM
|