BLD-Final | 4/30/2002 | 5/1/2002 | 5/1/2002 | A | PASS |
Tom Arcoraci
|
|
|
fn occ matt- ###-####
|
BLD-Energy code compliance | 2/8/2002 | 2/11/2002 | 2/11/2002 | A | PASS |
Steven Webb
|
|
|
###-####ok to cover 2/11/2002 10:01:00 AM
|
BLD-Framing/Rough-in | 2/7/2002 | 2/7/2002 | 2/7/2002 | P | PART |
Steven Webb
|
|
|
###-#### c/n--ok to insulate 2/7/2002 2:00:34 PM
|
BLD-Framing/Rough-in | 2/5/2002 | 2/6/2002 | 2/6/2002 | A | PART |
Dave Hannah
|
|
|
###-#### sheer ok to cover ext all but for areas needing engineering on hold downs 4 locations 2/6/2002 1:15:58 PM
|
BLD-Foundation | 12/17/2001 | 12/18/2001 | 12/18/2001 | P | PART |
Steven Webb
|
|
|
TODD ###-#### wip 12/18/2001 2:40:49 PM
|
BLD-Footing | 12/17/2001 | 12/17/2001 | 12/17/2001 | A | PART |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 12/17/2001 9:35:24 AM--footing requested for 12/14/01 but was never assigned to an inspector--contractor contacted Ins. 325 discussed and said ok to pour--I reviewed footing this am appears ok.. 12/17/2001 9:40:29 AM
|