Permit Information
Permit NumberBLD01-03188
StatusFinaled
Name TAHOE CONSTRUCTION
Site Address 4962 E STEMWOOD ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 2328 sq. ft. two story single family dwelling with a 760 sq. ft. attached three car garage, a 115 sq. ft. covered entry porch and free-form concrete patio at rear of structure per approved plans, all engineering and attached requirement lists. (1st floor 1063 sq. ft.)(2nd floor 1265 sq. ft.) PC #816 CUP #98-116 SOLAR PROTECTED DJO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/29/20024/30/20024/30/2002AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 04/29/2002 at 21:40:30. Contact: ###-####.c/n on site 4/30/2002 9:55:22 AM
BLD-Final4/30/20024/30/20024/30/2002PPASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 04/30/2002 at 09:59:21. Contact: ###-####. c. of c. #22389 issued. 4/30/2002 2:58:28 PM
BLD-Energy code compliance3/11/20023/12/20023/12/2002PPASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/11/2002 at 17:21:58. Contact: ###-####.
BLD-Energy code compliance3/11/20023/12/20023/11/2002ACANC
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/11/2002 at 10:15:02. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 03/11/2002 at 17:21:05.
BLD-Framing/Rough-in3/7/20023/8/20023/8/2002APART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/07/2002 at 14:44:46. Contact: ###-####. c/n issued-ok to insulate 3/8/2002 9:46:53 AM
BLD-Other2/25/20022/26/20022/26/2002PPASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/25/2002 at 11:25:59. Contact: ###-####...shear panels ok 2/26/2002 2:03:42 PM
BLD-Foundation1/28/20021/28/20021/28/2002PPASS
DetailsSteven Webb
clint ###-#### foundation wall
BLD-Footing1/25/20021/25/20021/25/2002PPART
DetailsSteven Webb
###-#### wip--5% ready for inspection--Builder to change position of house--will still comply with required city setbacks. 15' in front--at least 20' from rear of sidewalk to front of garage. 1/25/2002 1:37:54 PM