BLD-Final | 10/1/2002 | 10/1/2002 | 10/1/2002 | P | PASS |
Jim Sly
|
|
|
PERMIT NEEDS TO BE DOC FINALED C/C issued. 10/1/2002 1:45:22 PM
|
BLD-Final | 3/20/2002 | 3/21/2002 | 3/21/2002 | A | PASS |
Jim Sly
|
|
|
john -###-#### C/C issued. 3/21/2002 2:37:05 PM
|
BLD-Framing/Rough-in | 2/6/2002 | 2/6/2002 | 2/6/2002 | P | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 2/5/2002 | 2/5/2002 | 2/5/2002 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/05/2002 at 06:16:25. Contact: ###-####. C/N posted. 2/5/2002 11:09:49 AM
|
BLD-Foundation | 1/14/2002 | 1/15/2002 | 1/15/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/14/2002 at 18:02:51. Contact: ###-####.
|
BLD-Footing | 1/14/2002 | 1/14/2002 | 1/14/2002 | P | NR |
Tom Arcoraci
|
|
|
###-#### dig is all that is done 1/14/2002 2:17:33 PM
|