BLD-Final | 3/12/2002 | 3/13/2002 | 3/13/2002 | A | PASS |
Jim Sly
|
|
|
DAVE ###-#### C/C issued. 3/13/2002 8:47:37 AM
|
BLD-Energy code compliance | 1/21/2002 | 1/22/2002 | 1/22/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/21/2002 at 15:00:22. Contact: ###-####. Frame pass 1/22/2002 11:24:04 AM
|
BLD-Framing/Rough-in | 1/17/2002 | 1/18/2002 | 1/18/2002 | A | FAIL |
Jim Sly
|
|
|
DAVE ###-#### C/N posted. 1/18/2002 9:46:32 AM
|
BLD-Foundation | 12/20/2001 | 12/21/2001 | 12/21/2001 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Footing | 12/20/2001 | 12/20/2001 | 12/20/2001 | P | PART |
Jim Sly
|
|
|
JAMES ###-####
|