BLD-Final | 6/21/2002 | 6/24/2002 | 6/24/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/21/2002 at 15:04:14. Contact: ###-####.
|
BLD-Final | 6/21/2002 | 6/24/2002 | 6/24/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/21/2002 at 15:04:14. Contact: ###-####.c.c # 22010 issued 6/24/2002 10:43:06 AM
|
BLD-Final | 6/21/2002 | 6/24/2002 | 6/24/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/21/2002 at 15:04:14. Contact: ###-####.c.c # 22010 issued 6/24/2002 10:43:06 AM
|
BLD-Final | 6/21/2002 | 6/24/2002 | 6/24/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/21/2002 at 15:04:14. Contact: ###-####.c.c # 22010 issued 6/24/2002 10:43:06 AM
|
BLD-Final | 6/21/2002 | 6/24/2002 | 6/24/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/21/2002 at 15:04:14. Contact: ###-####.c.c # 22010 issued 6/24/2002 10:43:06 AM
|
BLD-Final | 6/14/2002 | 6/17/2002 | 6/17/2002 | A | FAIL |
Jim Storey
|
|
|
1. supply heating boots not insulated to sub-floor with r-6
2. missing perimtor r-19 in crawl space west wall at plm.
3. smoke seal not instaled can not insp self closing fire door.
4. fire stop overhead door wiring in garage wall and ceilling.
5. fire place has not had a final insp. permit stil open.
|
BLD-Framing/Rough-in | 4/10/2002 | 4/10/2002 | 4/10/2002 | P | PASS |
Steven Webb
|
|
|
shear wall interior\\###-#### Interior shear 4/10/2002 3:51:55 PM
|
BLD-Framing/Rough-in | 4/9/2002 | 4/9/2002 | 4/9/2002 | P | FAIL |
Steven Webb
|
|
|
###-#### ALAN Interior shear--not per plans--blocking needed at seams then nailing .Do not mud / tape. 4/9/2002 1:33:51 PM
|
BLD-Energy code compliance | 4/3/2002 | 4/4/2002 | 4/4/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/03/2002 at 15:56:28. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/27/2002 | 3/28/2002 | 3/28/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/27/2002 at 16:54:27. Contact: ###-####. Corrects completed on prior c/n--ok to insulate. 3/28/2002 8:39:15 AM
|
BLD-Framing/Rough-in | 3/18/2002 | 3/19/2002 | 3/19/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/18/2002 at 16:37:16. Contact: ###-####. c/n wip--ok to insulate 3/19/2002 2:10:19 PM
|
BLD-Wall cover | 3/3/2002 | 3/4/2002 | 3/4/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/03/2002 at 17:58:46. Contact: ###-####. SHEAR--OK TO SIDE 3/5/2002 7:48:10 AM
|
BLD-Foundation | 1/31/2002 | 2/1/2002 | 2/1/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/31/2002 at 18:16:07. Contact: ###-####. wip--5% ready at time of inspection 2/1/2002 10:34:44 AM
|
BLD-Footing | 1/30/2002 | 1/31/2002 | 1/31/2002 | A | PART |
Steven Webb
|
|
|
CHRIS ###-#### 70% ready at time of inspection. 1/31/2002 10:21:20 AM
|
BLD-Footing | 1/30/2002 | 1/30/2002 | 1/30/2002 | P | CANC |
Steven Webb
|
|
|
CHRIS ###-#### by contractor 1/30/2002 12:30:59 PM
|