BLD-Aging Inspection | 12/16/2003 | 12/16/2003 | 12/16/2003 | | DONE |
Jim Storey
|
|
|
7/26/02 310 12/16/2003 9:34:21 AM
|
BLD-Final | 7/25/2002 | 7/26/2002 | 7/26/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/25/2002 at 08:08:02. Contact: ###-####.final ok l/c. 7/26/2002 1:10:39 PM
|
FIRE-Final Inspection | 7/26/2002 | 7/26/2002 | 7/26/2002 | P | PASS |
Rick Jackson
|
|
|
|
Code Occupancy Approval | 7/23/2002 | 7/23/2002 | 7/23/2002 | P | PASS |
Wm. Michael Meloy
|
|
|
Approved for shell only. 7/23/2002 2:42:00 PM
|
BLD-Wall cover | 6/4/2002 | 6/5/2002 | 6/5/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/04/2002 at 10:48:09. Contact: ###-####.reports justifing iuses signed off by engineer of record. 6/5/2002 9:48:30 AM
|
BLD-Wall cover | 5/28/2002 | 5/28/2002 | 5/28/2002 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/28/2002 at 08:25:31. Contact: ###-####. OK to cover Exterior walls (Pending Electr, Plumbing approval) and (1) side Tenant Dem wall. 5/28/2002 3:22:36 PM
|
BLD-Other | 5/22/2002 | 5/23/2002 | 5/23/2002 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/22/2002 at 12:04:34. Contact: ###-####. perimotor welding not full width of inbed/ engineered colm to rebar not welded with proper rod and missing pass under bar to colm. to be resolved with special insp and engineer pending reports. 5/23/2002 3:54:07 PM
|
BLD-Other | 5/7/2002 | 5/8/2002 | 5/8/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/07/2002 at 15:01:36. Contact: ###-####.
|
BLD-Other | 5/7/2002 | 5/8/2002 | 5/8/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/07/2002 at 15:02:18. Contact: ###-####. walls toped out si pending. 5/8/2002 4:52:23 PM
|
BLD-Foundation | 3/21/2002 | 3/22/2002 | 3/22/2002 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/21/2002 at 12:20:10. Contact: ###-####. Rebar appears OK but, Appr plan Req. special insp reinforcem. Need: A- Letter from Eng. delete special insp. OR B- Approval of modified plan. OR C- Have special insp agency insp rebar prior to pour. Spec insp Req Welding, Masonry, Epoxy. 3/22/2002 10:18:35 AM 3/22/2002 10:20:19 AM
|
BLD-Footing | 3/18/2002 | 3/19/2002 | 3/19/2002 | A | NR |
Jim Storey
|
|
|
ft insp dale- ###-#### bad weather conitions ft not covered. recall. 3/19/2002 2:16:20 PM
|
BLD-Footing | 3/12/2002 | 3/13/2002 | 3/13/2002 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/12/2002 at 12:39:03. Contact: ###-####. north ft and 50% ok east ft rebar ok. 3/13/2002 4:31:06 PM
|
BLD-Other | 5/7/2002 | 3/25/2000 | 3/25/2000 | A | PART |
Jim Storey
|
|
|
massonary insp. top out south wall ok pending special insp.
|