Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-03232
StatusFinaled
Name RUWE CONSTRUCTION
Site Address 2028 W FALCON POINT CT
Project NameHILLSIDE
Customer Number 
ePlanReviewNo
Description
To construct a 5000 sq. ft. two story single family dwelling with a 1389 sq. ft. attached three car garage, a 108 sq. ft. covered concrete entry stoop and free-form concrete patio at rear of structure per approved plans, all engineering/red-lining and attached requirement lists. (1st floor 3189 sq. ft.)(2nd floor 1811 sq. ft.) This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and 30 ft. defensible area will be maintained. Engineering for skylight and canopy shall be provided to structural inspector on or before frame inspection and will require stamp from licensed Idaho State Engineer. Skylight and canopy will meet the fire classification for Class "A" roof covering. See comments in condition list. PC #838 DJO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/9/200210/9/200210/9/2002PPASS
DetailsTony Young
AS LATE AS POSSIBLE; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD-Final10/4/200210/4/200210/4/2002PFAIL
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung C/N posted. 10/4/2002 1:26:05 PM
BLD-Grading Inspection10/3/200210/3/200210/3/2002 PASS
DetailsRita DeYoung
Final grading and drainage is complete and approved by the engineer and the City.
BLD-Energy code compliance3/10/20023/11/20023/11/2002APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/10/2002 at 21:57:47. Contact: ###-####.
BLD-Energy code compliance3/7/20023/7/20023/7/2002PPART
DetailsTony Young
###-#### TRENTON
ok to cover garage and upper west 3/7/2002 3:02:39 PM
BLD-Framing/Rough-in3/5/20023/5/20023/5/2002PPART
DetailsTony Young
###-#### TRENTON
c/n posted,, ok to insulate 3/5/2002 3:35:09 PM
BLD-Framing/Rough-in3/1/20023/4/20023/4/2002PPART
DetailsTony Young
ext shear ok 3/4/2002 2:22:07 PM
BLD-Framing/Rough-in3/1/20023/4/20023/4/2002ANR
DetailsTony Young
Scheduled by Inspector: 407 On 3/1/2002 5:49:42 PM
BLD-Framing/Rough-in3/4/20023/4/20023/4/2002PPART
DetailsTony Young
ext. shear ok 3/4/2002 2:23:18 PM
BLD-Framing/Rough-in2/28/20023/1/20023/1/2002PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/28/2002 at 21:49:25. Contact: ###-####. Unable to do this day to many others. I have set this up for 3/4/02 am. 3/1/2002 5:45:55 PM
BLD-Foundation1/15/20021/15/20021/15/2002PPART
DetailsCarl Dependahl
###-#### LOGAN, walls...chk hd's at frame insp. 1/15/2002 4:45:35 PM
BLD-Footing1/10/20021/11/20021/11/2002PPART
DetailsTony Young
###-#### trenton
BLD-Grading Inspection1/8/20021/8/20021/8/2002 PASS
DetailsRita DeYoung
Geotechnical engineer has approved foundation subgrade as long as all loose material has been removed from the excavation.