BLD-Final | 3/12/2002 | 3/13/2002 | 3/13/2002 | P | PASS |
Jim Sly
|
|
|
DAVE ###-#### C/C issued. 3/13/2002 2:42:05 PM
|
BLD-Energy code compliance | 2/7/2002 | 2/8/2002 | 2/8/2002 | A | PASS |
Jim Sly
|
|
|
DAVE ###-#### Frame OK. 2/8/2002 3:37:47 PM
|
BLD-Framing/Rough-in | 2/6/2002 | 2/7/2002 | 2/7/2002 | A | FAIL |
Jim Sly
|
|
|
DAVE ###-#### C/N posted. 2/7/2002 10:01:30 AM
|
BLD-Foundation | 1/8/2002 | 1/8/2002 | 1/8/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/08/2002 at 07:00:46. Contact: ###-####.
|
BLD-Conference | 1/7/2002 | 1/7/2002 | 1/7/2002 | P | PART |
Jim Sly
|
|
|
###-#### Footing insp. 1/7/2002 3:28:23 PM
|