Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-03252
StatusFinaled
Name BOISE CITY (BUS)
Site Address 4788 S ORCHARD ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(BOISE CITY-BUS)(VIATRANS BUS MAINTENANCE) To relocate an existing monorail crane system, install a new jib crane in brake repair room and infill existing hydraulic line trench within the existing 15957 sq ft shop area of the Bosie City bus maintenance facility. All work per approved plans and engineering. This building is fully fire sprinklered for area increase. (pc#941-01) *RmH*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection3/25/20033/25/20033/25/2003 PASS
DetailsJim Storey
FIRE-Final Inspection2/28/20022/28/20022/28/2002PPASS
DetailsTroy Cobbley
Added by Inspector: 430 On 2/28/2002 3:49:29 PM Fire life/safety finaled
BLD-Final2/26/20022/27/20022/27/2002AFAIL
DetailsTom Arcoraci
###-#### needs fire and final letter from spec insp ????? 2/27/2002 8:57:18 AM
FIRE-Final Inspection2/20/20022/21/20022/21/2002AFAIL
DetailsTroy Cobbley
repair exit sign at east exit and tag fire alarm system 2/21/2002 10:28:10 AM
BLD-Final2/18/20022/19/20022/19/2002AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/18/2002 at 12:18:34. Contact: ###-####. need fire and ele sign offs as well as special insp. final letter. on site meets approved plans. 2/19/2002 5:04:08 PM
BLD-Concrete2/4/20022/5/20022/5/2002PPASS
DetailsJim Storey
###-#### trench infil rebar ok for cover. 2/5/2002 3:55:17 PM