BLD-Aging Inspection | 2/13/2004 | 2/13/2004 | 2/13/2004 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 9/10/2002 | 9/10/2002 | 9/10/2002 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/10/2002 at 09:06:53. Contact: ###-####.not for occupancy, Interior "shell" only. 9/10/2002 1:14:22 PM
|
FIRE-Final Inspection | 9/9/2002 | 9/10/2002 | 9/10/2002 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 09/09/2002 at 15:54:04. Contact: ###-####.
|
BLD-Final | 9/6/2002 | 9/9/2002 | 9/9/2002 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/06/2002 at 16:19:28. Contact: ###-####...Int. "shell"...need fire/safety final; struct ok for 9/9/2002 3:03:38 PM 9/9/2002 3:07:44 PM
|
BLD-Framing/Rough-in | 3/27/2002 | 3/27/2002 | 3/27/2002 | P | PART |
Carl Dependahl
|
|
|
###-#### CHRIS CALL 1ST PLEASE; grid ok pending hvac ok; keep c/n re chk 4hr wall at canopy o.h. 3/27/2002 4:25:47 PM
|
BLD-Framing/Rough-in | 3/26/2002 | 3/26/2002 | 3/26/2002 | P | NH |
Russ Owen
|
|
|
###-#### CHRIS . No one here locked out < also called this number. 3/26/2002 1:59:40 PM
|
FIRE-Final Inspection | 3/25/2002 | 3/26/2002 | 3/26/2002 | A | NR |
Rick Jackson
|
|
|
###-#### chris wrong inspection called in; talked to Chris and he wanted structural inspector 3/26/2002 11:32:56 AM
|
BLD-Framing/Rough-in | 2/26/2002 | 2/27/2002 | 2/27/2002 | P | PART |
Carl Dependahl
|
|
|
###-####; ok to cover demising wall 2/27/2002 5:54:44 PM
|
BLD-Framing/Rough-in | 2/14/2002 | 2/15/2002 | 2/15/2002 | P | FAIL |
Carl Dependahl
|
|
|
fr chris-- ###-#### ; C/N: "canopy" framing; extend 4hr. wall through to exterior; eng'r to approve tube steel framing fabrication supporting new opening at masonry wall & "C-channel" lintels installed w/o inspection...report pending? 2/19/2002 1:19:05 PM
|