Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD01-03253
StatusExpired
Name SUNDANCE INVESTMENTS LTD PRTSP
Site Address 730 S AMERICANA BLVD
Project NameSHORELINE TECH CENTER
Customer Number 
ePlanReviewNo
Description
(SHORELINE TECH CENTER - EAST END) This building is fire sprinklered for area increase. To construct interior shell improvements to an existing 21,670 square foot building. Exterior shell improvements were done under permit BLD00-02062. Existing restrooms and nonbearing walls are being demolished. Work is to include interior nonbearing walls, interior finishes, and suspended ceilings all per approved drawings and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. OCCUPANCY IS NOT ALLOWED UNDER THIS PERMIT. PC01-0941 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection2/13/20042/13/20042/13/2004 DONE
DetailsDave Hannah
BLD-Final9/10/20029/10/20029/10/2002PPASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/10/2002 at 09:06:53. Contact: ###-####.not for occupancy, Interior "shell" only. 9/10/2002 1:14:22 PM
FIRE-Final Inspection9/9/20029/10/20029/10/2002APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 09/09/2002 at 15:54:04. Contact: ###-####.
BLD-Final9/6/20029/9/20029/9/2002PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/06/2002 at 16:19:28. Contact: ###-####...Int. "shell"...need fire/safety final; struct ok for 9/9/2002 3:03:38 PM 9/9/2002 3:07:44 PM
BLD-Framing/Rough-in3/27/20023/27/20023/27/2002PPART
DetailsCarl Dependahl
###-#### CHRIS CALL 1ST PLEASE; grid ok pending hvac ok; keep c/n re chk 4hr wall at canopy o.h. 3/27/2002 4:25:47 PM
BLD-Framing/Rough-in3/26/20023/26/20023/26/2002PNH
DetailsRuss Owen
###-#### CHRIS . No one here locked out < also called this number. 3/26/2002 1:59:40 PM
FIRE-Final Inspection3/25/20023/26/20023/26/2002ANR
DetailsRick Jackson
###-#### chris wrong inspection called in; talked to Chris and he wanted structural inspector 3/26/2002 11:32:56 AM
BLD-Framing/Rough-in2/26/20022/27/20022/27/2002PPART
DetailsCarl Dependahl
###-####; ok to cover demising wall 2/27/2002 5:54:44 PM
BLD-Framing/Rough-in2/14/20022/15/20022/15/2002PFAIL
DetailsCarl Dependahl
fr chris-- ###-#### ; C/N: "canopy" framing; extend 4hr. wall through to exterior; eng'r to approve tube steel framing fabrication supporting new opening at masonry wall & "C-channel" lintels installed w/o inspection...report pending? 2/19/2002 1:19:05 PM