BLD-Final | 5/7/2002 | 5/8/2002 | 5/8/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/07/2002 at 14:22:58. Contact: ###-####. C/C issued. 5/9/2002 9:38:21 AM
|
BLD-Energy code compliance | 3/4/2002 | 3/5/2002 | 3/5/2002 | A | PASS |
Jim Sly
|
|
|
###-#### JOSH Frame pass. 3/5/2002 3:33:02 PM
|
BLD-Energy code compliance | 3/1/2002 | 3/4/2002 | 3/4/2002 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/01/2002 at 17:52:04. Contact: ###-####. C/N posted. 3/4/2002 12:06:18 PM
|
BLD-Energy code compliance | 3/4/2002 | 3/4/2002 | 3/4/2002 | P | FAIL |
Jim Sly
|
|
|
###-#### JOSH C/N posted. 3/4/2002 1:49:49 PM
|
BLD-Framing/Rough-in | 2/28/2002 | 3/1/2002 | 3/1/2002 | A | FAIL |
Jim Sly
|
|
|
###-#### C/N....Need Mech.......... 3/1/2002 12:45:56 PM
|
BLD-Framing/Rough-in | 2/26/2002 | 2/27/2002 | 2/27/2002 | A | FAIL |
Russ Owen
|
|
|
JOSHUA ###-#### PLEASE CALL BRFORE GOING OUT. c/n posted. 2/27/2002 11:13:29 AM
|
BLD-Framing/Rough-in | 2/13/2002 | 2/18/2002 | 2/15/2002 | A | CANC |
Jim Sly
|
|
|
joshua ###-####
|
BLD-Framing/Rough-in | 2/13/2002 | 2/14/2002 | 2/14/2002 | A | PART |
Jim Sly
|
|
|
###-#### joshua sheer wall Shear OK. 2/14/2002 10:33:39 AM
|
BLD-Concrete | 1/21/2002 | 1/22/2002 | 1/22/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/21/2002 at 09:04:20. Contact: ###-####.
|
BLD-Footing | 1/18/2002 | 1/18/2002 | 1/18/2002 | P | PART |
Jim Sly
|
|
|
###-####
|