BLD-Final | 4/30/2002 | 4/30/2002 | 4/30/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/30/2002 at 06:52:14. Contact: ###-####. C/C issued. 4/30/2002 10:45:44 AM
|
BLD-Framing/Rough-in | 3/4/2002 | 3/4/2002 | 3/4/2002 | P | PASS |
Jim Sly
|
|
|
###-#### BILL
|
BLD-Framing/Rough-in | 2/28/2002 | 3/1/2002 | 3/1/2002 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by Inspector: 407 On 2/28/2002 5:34:46 PM c/n on site 3/1/2002 1:03:14 PM
|
BLD-Framing/Rough-in | 2/28/2002 | 2/28/2002 | 2/28/2002 | P | CANC |
Russ Owen
|
|
|
the later the better\\###-#### To many others to do. 2/28/2002 5:43:00 PM
|
BLD-Footing | 2/1/2002 | 2/1/2002 | 2/1/2002 | P | PASS |
Dave Hannah
|
|
|
###-#### DANE
|
BLD-Footing | 1/31/2002 | 1/31/2002 | 1/31/2002 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/31/2002 at 06:55:29. Contact: ###-####.
|
BLD-Footing | 1/31/2002 | 1/31/2002 | 1/31/2002 | P | PASS |
Tom Arcoraci
|
|
|
###-####
|