BLD-Final | 7/30/2002 | 7/31/2002 | 7/31/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/30/2002 at 16:07:42. Contact: ###-####. C/C issued. 7/31/2002 3:17:22 PM
|
BLD-Final | 7/1/2002 | 7/2/2002 | 7/2/2002 | A | NR |
Jim Sly
|
|
|
Kevin, ###-#### ~ : )
|
BLD-Framing/Rough-in | 3/4/2002 | 3/4/2002 | 3/4/2002 | P | PASS |
Jim Sly
|
|
|
###-#### bob
|
BLD-Framing/Rough-in | 3/1/2002 | 3/1/2002 | 3/1/2002 | P | FAIL |
Dave Hannah
|
|
|
###-#### fixed one but still have one to do 3/1/2002 2:03:57 PM
|
BLD-Energy code compliance | 2/26/2002 | 2/26/2002 | 2/26/2002 | P | PART |
Russ Owen
|
|
|
BOB ###-#### Need to complete 1 prior c/n provide engineering from floor truss company for over sized hole in kitchen lid. 2/26/2002 3:02:33 PM
|
BLD-Framing/Rough-in | 2/21/2002 | 2/21/2002 | 2/21/2002 | P | FAIL |
Jim Sly
|
|
|
###-#### BOB C/N posted 2/21/2002 4:22:52 PM
|
BLD-Framing/Rough-in | 2/6/2002 | 2/6/2002 | 2/6/2002 | P | PART |
Jim Sly
|
|
|
###-#### BOB Shear OK 2/6/2002 3:46:43 PM
|
BLD-Framing/Rough-in | 1/31/2002 | 2/1/2002 | 2/1/2002 | P | FAIL |
Dave Hannah
|
|
|
missing hold downs floor to floor strapes plans are unclear on what the engineer is trying to do on this house builder will get clarification 2/1/2002 2:00:06 PM
|
BLD-Foundation | 1/10/2002 | 1/10/2002 | 1/10/2002 | P | PASS |
Jim Sly
|
|
|
wall \\###-####
|
BLD-Footing | 1/8/2002 | 1/9/2002 | 1/9/2002 | A | PASS |
Jim Sly
|
|
|
###-#### BOB
|