BLD-Final | 4/29/2002 | 4/30/2002 | 4/30/2002 | A | PASS |
Russ Owen
|
|
|
###-#### IVAN
|
BLD-Final | 4/16/2002 | 4/17/2002 | 4/17/2002 | A | FAIL |
Dave Hannah
|
|
|
###-#### IVAN no one home also no plumbing final 4/17/2002 12:57:51 PM
|
BLD-Energy code compliance | 2/22/2002 | 2/22/2002 | 2/22/2002 | P | PASS |
Dave Hannah
|
|
|
###-#### ivan
|
BLD-Framing/Rough-in | 2/19/2002 | 2/20/2002 | 2/20/2002 | P | PASS |
Dave Hannah
|
|
|
###-#### IVAN ok to insulate after elec r/i 2/20/2002 5:22:27 PM
|
BLD-Framing/Rough-in | 2/11/2002 | 2/12/2002 | 2/12/2002 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 02/11/2002 at 15:44:45. Contact: ###-####. talked about stairs what needeed to be done to get them to code also went over truss that was cut up by stairs crew is going to use conventional framing and add bearing point down to footing 2/12/2002 12:26:37 PM
|
BLD-Conference | 2/8/2002 | 2/8/2002 | 2/8/2002 | P | DONE |
Dave Hannah
|
|
|
Scheduled by Inspector: 425 On 2/8/2002 12:34:13 PM stairs need to be redone also need 2/8/2002 4:01:19 PM eng on truss that was cut up by stairs 2/8/2002 4:02:25 PM
|