BLD-Final | 5/6/2002 | 5/6/2002 | 5/6/2002 | P | PASS |
Steven Webb
|
|
|
fn ###-####- steve c. of c. #22391 issued. 5/6/2002 2:24:19 PM
|
BLD-Final | 5/3/2002 | 5/3/2002 | 5/3/2002 | P | NH |
Steven Webb
|
|
|
###-#### STEVE C/N--No access to building to perform inspection. 5/3/2002 2:52:59 PM
|
BLD-Framing/Rough-in | 4/26/2002 | 4/26/2002 | 4/26/2002 | P | DONE |
Steven Webb
|
|
|
###-#### BRIAN Framing already been passed, no telephone response from contact. 4/26/2002 3:00:45 PM
|
BLD-Framing/Rough-in | 3/6/2002 | 3/6/2002 | 3/6/2002 | P | PASS |
Steven Webb
|
|
|
###-#### ENERGY--c/n items corrected--ok to cover framing. 3/6/2002 2:01:51 PM
|
BLD-Framing/Rough-in | 2/28/2002 | 3/1/2002 | 3/1/2002 | P | PART |
Steven Webb
|
|
|
###-#### c/n-ok to insulate 3/1/2002 1:32:27 PM
|
BLD-Framing/Rough-in | 2/21/2002 | 2/22/2002 | 2/22/2002 | A | PART |
Jim Sly
|
|
|
###-#### steve Shear OK. 2/22/2002 10:10:53 AM
|
BLD-Foundation | 1/31/2002 | 1/31/2002 | 1/31/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/31/2002 at 07:38:37. Contact: ###-####. 95% ready at time of inspection 1/31/2002 12:49:36 PM
|
BLD-Footing | 1/30/2002 | 1/30/2002 | 1/30/2002 | P | PART |
Steven Webb
|
|
|
ft dane- ###-#### wip--advised contractor to cover concrete due to cold weather. 1/30/2002 2:13:59 PM
|