BLD-Final | 3/15/2002 | 3/15/2002 | 3/15/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/15/2002 at 08:52:32. Contact: ###-####. ok for perm occ 3/15/2002 3:36:54 PM
|
Permanent Occupancy | | 3/15/2002 | 3/15/2002 | | DONE |
|
|
|
|
FIRE-Final Inspection | 3/13/2002 | 3/14/2002 | 3/14/2002 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 03/13/2002 at 15:17:57. Contact: ###-####. called contractor and he will change out the thumb turn on interior exit door and will have ready for the structural inspector 3/14/2002 9:57:44 AM
|
FIRE-Final Inspection | 3/12/2002 | 3/13/2002 | 3/13/2002 | A | FAIL |
Troy Cobbley
|
|
|
repair exit sign at main exit and provide approved door hardware on office doors (no knobs) levers ok 3/13/2002 10:36:14 AM
|
BLD-Framing/Rough-in | 2/12/2002 | 2/12/2002 | 2/12/2002 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 02/12/2002 at 08:34:37. Contact: ###-####. needs mech permit and insp 2/12/2002 1:52:30 PM
|