Permanent Occupancy | | 8/9/2002 | 8/9/2002 | | DONE |
|
|
|
|
BLD-Final | 8/7/2002 | 8/8/2002 | 8/8/2002 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/07/2002 at 09:37:02. Contact: ###-####. ok for perm when plumbing signs perm 8/8/2002 9:41:52 AM
|
FIRE-Final Inspection | 8/6/2002 | 8/7/2002 | 8/7/2002 | A | PASS |
Troy Cobbley
|
|
|
fire life/safety finaled. No door hardware has been installed yet. the structural inspector will need to verify 8/7/2002 8:28:47 AM
|
FIRE-Final Inspection | 8/5/2002 | 8/6/2002 | 8/6/2002 | P | FAIL |
Troy Cobbley
|
|
|
duct detector not operating correctly. contractor is verifiying that the unit is moving more air than 2,000 cfm to even require the duct detector 8/6/2002 2:04:36 PM
|
FIRE-Final Inspection | 8/5/2002 | 8/5/2002 | 8/5/2002 | P | FAIL |
Troy Cobbley
|
|
|
duct detector needs to be tested and door hardware installed 8/5/2002 3:37:10 PM
|
BLD-Other | 7/30/2002 | 7/31/2002 | 7/31/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 07/30/2002 at 12:03:37. Contact: ###-####. grid ok 7/31/2002 9:54:07 AM
|
BLD-Framing/Rough-in | 6/25/2002 | 6/26/2002 | 6/26/2002 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/25/2002 at 11:31:14. Contact: . needs to have arch submit to plan reveiw on 1 hr const 6/26/2002 2:13:34 PM
|
BLD-Footing | 5/31/2002 | 5/31/2002 | 5/31/2002 | P | PASS |
Dave Hannah
|
|
|
###-#### tom ftgs for sec floor floor load 5/31/2002 2:09:17 PM
|
BLD-Footing | 4/25/2002 | 4/26/2002 | 4/26/2002 | A | PASS |
Tom Arcoraci
|
|
|
ft insp ###-####- joe
|