BLD-Final | 6/18/2002 | 6/19/2002 | 6/19/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/18/2002 at 12:20:04. Contact: ###-####. C. of C. #22475 issued. 6/19/2002 8:09:33 AM
|
BLD-Final | 6/17/2002 | 6/18/2002 | 6/18/2002 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/17/2002 at 13:50:07. Contact: ###-####. C/N on site. 6/18/2002 10:03:29 AM
|
BLD-Energy code compliance | 3/22/2002 | 3/25/2002 | 3/25/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/22/2002 at 14:38:50. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/20/2002 | 3/20/2002 | 3/20/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/20/2002 at 09:43:36. Contact: ###-####. ok to insulate 3/20/2002 1:54:20 PM
|
BLD-Framing/Rough-in | 3/12/2002 | 3/12/2002 | 3/12/2002 | P | PART |
Steven Webb
|
|
|
###-#### MIKE EXT. SHEAR--ok to side--interior shear needs inspection for mst37, hd and osb panels at framing. 3/12/2002 2:07:19 PM
|
BLD-Conference | 2/26/2002 | 2/26/2002 | 2/26/2002 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/26/2002 3:22:47 PM ok to delete 4x4's at bay corners; int hd's ok to set above sill plate per Simpson.
|
BLD-Foundation | 2/5/2002 | 2/5/2002 | 2/5/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 02/05/2002 at 06:52:06. Contact: ###-####. WIP--15% ready at time of inspection--talked to builder--Canyon--per plan reviewer--stamped eng. needed for major point load in garage--to be faxed to me. 2/5/2002 9:44:04 AM
|
BLD-Footing | 2/4/2002 | 2/4/2002 | 2/4/2002 | P | PART |
Steven Webb
|
|
|
JACK ###-#### wip--45% completed at time of inspection. 2/4/2002 2:48:55 PM
|