Permanent Occupancy | | 8/22/2002 | 8/22/2002 | | DONE |
|
|
|
|
BLD-Final | 8/16/2002 | 8/16/2002 | 8/16/2002 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/16/2002 at 10:35:23. Contact: ###-####.
ok for c of o pending trades 8/16/2002 2:26:37 PM
|
BLD-Final | 7/29/2002 | 7/29/2002 | 7/29/2002 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/29/2002 at 09:15:39. Contact: .
c/n posted,,, guard rail not per code 7/29/2002 2:38:11 PM
|
FIRE-Final Inspection | 7/23/2002 | 7/23/2002 | 7/23/2002 | P | PASS |
Rick Jackson
|
|
|
|
BLD-Final | 7/11/2002 | 7/12/2002 | 7/12/2002 | P | CANC |
Tony Young
|
|
|
key is over the door \###-####--cancel per larry fisher
|
FIRE-Final Inspection | 7/11/2002 | 7/12/2002 | 7/12/2002 | A | FAIL |
Rick Jackson
|
|
|
###-#### key is over the top of the door need to test the alarms; fire extinguisher 7/12/2002 11:22:55 AM
|
BLD-Framing/Rough-in | 5/16/2002 | 5/16/2002 | 5/16/2002 | P | PASS |
Tony Young
|
|
|
fr insp larry- ###-####
deck frame 5/17/2002 8:50:31 AM
|
BLD-Framing/Rough-in | 5/16/2002 | 5/16/2002 | 5/16/2002 | P | PASS |
Tony Young
|
|
|
fr insp larry- ###-####
ramp framing 5/16/2002 2:59:51 PM
|
BLD-Foundation | 5/13/2002 | 5/13/2002 | 5/13/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/13/2002 at 09:09:41. Contact: . blk and tie down ok for cover. 5/13/2002 3:04:04 PM
|