BLD-Final | 9/3/2002 | 9/4/2002 | 9/4/2002 | A | PASS |
Tony Young
|
|
|
phil; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Grading Inspection | 9/3/2002 | 9/3/2002 | 9/3/2002 | | BOND |
Rita DeYoung
|
|
|
Fine grading has been completed, erosion protection is in place, and a bond for the incomplete revegetation is in place. The house can be finaled with the bond in place until the revegetation being completed.
|
BLD-Final | 8/22/2002 | 8/23/2002 | 8/23/2002 | A | PART |
Tony Young
|
|
|
###-####
ok for c of c after hillside is signed off 8/28/2002 3:08:09 PM
|
BLD-Energy code compliance | 5/6/2002 | 5/7/2002 | 5/7/2002 | P | PASS |
Tony Young
|
|
|
###-#### PHIL
|
BLD-Framing/Rough-in | 5/3/2002 | 5/6/2002 | 5/6/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by Inspector: 425 On 5/3/2002 5:05:46 PM ok to insulate shear also ok ok to cover ext 5/6/2002 9:21:42 AM
|
BLD-Framing/Rough-in | 5/2/2002 | 5/3/2002 | 5/3/2002 | P | CANC |
Dave Hannah
|
|
|
###-#### phil fr
|
BLD-Foundation | 3/13/2002 | 3/14/2002 | 3/14/2002 | A | PART |
Tony Young
|
|
|
###-#### donny
|
BLD-Footing | 3/5/2002 | 3/6/2002 | 3/6/2002 | P | PART |
Tony Young
|
|
|
###-#### DONNY
|
BLD-Grading Inspection | 3/6/2002 | 3/6/2002 | 3/6/2002 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade has been approved by the geotechnical engineer
|