Permit Information
Permit NumberBLD02-00145
StatusFinaled
Name TAHOE CONSTRUCTION
Site Address 3884 S MILL SITE AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a three bedroom, two and half bathroom 1841 sq. ft. two story single family dwelling (1036 sq. ft. first floor/805 sq. ft. second floor) with a attached 524 sq. ft. two car garage and a 179 sq. ft. covered front porch. Per approved plans and requirement list. PC#036 (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/6/20026/6/20026/6/2002PPASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 06/06/2002 at 11:00:59. Contact: ###-####. C. of C. #22410 issued. 6/6/2002 1:04:28 PM
BLD-Energy code compliance3/27/20023/28/20023/28/2002APASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/27/2002 at 15:02:17. Contact: ###-####.
BLD-Framing/Rough-in3/27/20023/28/20023/27/2002ACANC
DetailsSteven Webb
###-#### Disp set to [CANC] by a contractor via Hello! on 03/27/2002 at 15:03:13.
BLD-Energy code compliance3/26/20023/27/20023/27/2002AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/26/2002 at 11:03:36. Contact: ###-####.. Need plans for determination of interior shear walls. other items ok. 3/27/2002 12:19:57 PM 3/27/2002 12:19:59 PM
BLD-Framing/Rough-in3/25/20023/26/20023/25/2002ACANC
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/25/2002 at 11:46:50. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 03/25/2002 at 11:58:39.
BLD-Framing/Rough-in3/22/20023/25/20023/25/2002AFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/22/2002 at 13:20:59. Contact: ###-####. c/n posted--several items--need plumbing r.i--Do not insulate 3/25/2002 10:19:07 AM
BLD-Framing/Rough-in3/25/20023/25/20023/25/2002PPART
DetailsSteven Webb
###-#### c/n posted but plumbing r.i. approved--ok to insulate 3/25/2002 1:12:46 PM
BLD-Other3/11/20023/12/20023/12/2002PPASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/11/2002 at 12:37:36. Contact: ###-####. shear--ok to side 3/12/2002 3:32:10 PM
BLD-Foundation2/7/20022/7/20022/7/2002PPART
DetailsSteven Webb
###-#### wip--95 % ready all but hd. 2/7/2002 3:01:55 PM
BLD-Footing2/6/20022/6/20022/6/2002PPART
DetailsSteven Webb
Scheduled by Inspector: 420 On 2/6/2002 1:44:27 PM Forms moved to comply with required setbacks. 80% ready at time of inspection. 2/6/2002 1:47:04 PM
BLD-Footing2/5/20022/5/20022/5/2002PFAIL
DetailsSteven Webb
jake-- ###-#### ft Setback on front north not per approved plans. 2/5/2002 3:00:22 PM