BLD-Final | 2/20/2004 | 2/20/2004 | 2/20/2004 | P | PASS |
Russ Owen
|
|
|
trey; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Plumbing inspected by state of idaho. Verified by permit and talked with perason at the state. 2/19/2004 6:50:43 PM
|
BLD-Conference | 1/5/2004 | 1/5/2004 | 1/5/2004 | P | NH |
Russ Owen
|
|
|
Trey. please call first.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes called this number left message also see history. 1/5/2004 3:48:30 PM
|
BLD-Conference | 1/5/2004 | 1/5/2004 | 1/5/2004 | P | NH |
Russ Owen
|
|
|
Trey. please call first.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes called this number left message also see history. 1/5/2004 3:48:30 PM
|
BLD-Final | 12/12/2003 | 12/12/2003 | 12/12/2003 | P | FAIL |
Jim Sly
|
|
|
###-#### trey Owner called Contractor.....Contractor said he would have verification that Plumb was finaled (on site) for next inspection.......May have been inspected by the State. ? 12/12/2003 3:04:56 PM 12/12/2003 3:05:20 PM
|
BLD-Final | 11/21/2002 | 11/22/2002 | 11/22/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/21/2002 at 17:23:26. Contact: ###-####.The landing at the rear door is not minimum 3 out,called contractor and notified also still unable to find plumbing permit, might be adda county,contractor will check out. 11/22/2002 10:03:04 AM
|
BLD-Final | 4/17/2002 | 4/18/2002 | 4/18/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/17/2002 at 19:35:46. Contact: ###-####.Needs exterior landing at new door and verify plumbing final as it is not grouped with other permits i do not know the permit number contractor has been notified of the aboved via phone call. 4/18/2002 12:05:43 PM
|
BLD-Energy code compliance | 2/28/2002 | 2/28/2002 | 2/28/2002 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/28/2002 at 09:46:04. Contact: ###-####.
|
BLD-Energy code compliance | 2/26/2002 | 2/27/2002 | 2/27/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/26/2002 at 17:51:11. Contact: ###-####. Provide truss details and complete insulation. c/n posted. 2/27/2002 11:46:21 AM
|
BLD-Framing/Rough-in | 2/25/2002 | 2/26/2002 | 2/26/2002 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/25/2002 at 10:31:18. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/25/2002 | 2/25/2002 | 2/25/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 2/25/2002 3:40:16 PM need truss details and stud blocking at new beam at existing wall callled contractor. ok to insulate. 2/25/2002 3:42:39 PM
|
BLD-Foundation | 2/1/2002 | 2/4/2002 | 2/4/2002 | A | CANC |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 2/1/2002 6:01:43 PM
|
BLD-Foundation | 1/31/2002 | 2/1/2002 | 2/1/2002 | A | PART |
Dave Hannah
|
|
|
MARK ###-#### STEM WALL INSPECTION work in progress crew is tiying rebar havent started setting fors 2/1/2002 10:30:09 AM
|
BLD-Foundation | 1/31/2002 | 2/1/2002 | 2/1/2002 | P | CANC |
Russ Owen
|
|
|
MARK ###-#### STEM WALL INSPECTION. I was unable to get to this this day,I have left contractor a phone message,will reschedual for monday. 2/1/2002 6:01:24 PM
|
BLD-Footing | 1/28/2002 | 1/29/2002 | 1/29/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/28/2002 at 10:19:30. Contact: ###-####.appears ok no rebar req in footing. 1/30/2002 9:16:01 AM r 1/30/2002 9:16:47 AM
|