BLD-Final | 12/17/2002 | 12/18/2002 | 12/18/2002 | A | PASS |
Steven Webb
|
|
|
###-#### Signature by Public Works needed prior to issuance of C. of O. 12/18/2002 10:44:01 AM
|
Permanent Occupancy | | 12/18/2002 | 12/18/2002 | | DONE |
|
|
|
|
BLD-Conference | 12/11/2002 | 12/12/2002 | 12/12/2002 | P | PASS |
Carl Dependahl
|
|
|
w/ supt. keep c/n, wip. 12/12/2002 1:10:06 PM
|
BLD-Conference | 12/11/2002 | 12/11/2002 | 12/11/2002 | P | NR |
Carl Dependahl
|
|
|
gary--call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIRE-Final Inspection | 12/4/2002 | 12/4/2002 | 12/4/2002 | A | PART |
Rick Jackson
|
|
|
awaiting calcs for new mini horns installed in rooms
|
BLD-Final | 12/2/2002 | 12/3/2002 | 12/3/2002 | P | PART |
Carl Dependahl
|
|
|
###-####...c/n, damper, "s"door labels at corridors...ok for t/o... 12/3/2002 4:58:46 PM
|
Code Occupancy Approval | 12/2/2002 | 12/2/2002 | 12/2/2002 | P | PASS |
Wm. Michael Meloy
|
|
|
Compliance met. 12/2/2002 4:39:00 PM
|
FIRE-Final Inspection | 12/2/2002 | 12/2/2002 | 12/2/2002 | P | FAIL |
Rick Jackson
|
|
|
###-#### supervised ball valves needed for antifreeze system; temporal horns in rooms; record of completion 12/2/2002 4:47:48 PM
|
FIRE-Conference | 11/26/2002 | 11/26/2002 | 11/26/2002 | P | PART |
Rick Jackson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Amy Lawson met with Rod and alarm contractor; will attempt to test on Monday afternoon; reviewed plans; reviewed requirements for final 11/26/2002 1:50:41 PM
|
BLD-Conference | 10/28/2002 | 10/29/2002 | 10/29/2002 | A | PASS |
Carl Dependahl
|
|
|
need 1hr door at laundry 10/29/02 4:53:50 PM
|
BLD-Energy code compliance | 10/8/2002 | 10/9/2002 | 10/9/2002 | A | PASS |
Steven Webb
|
|
|
###-#### Air seal package completed. 10/9/2002 11:26:45 AM
|
BLD-Framing/Rough-in | 10/7/2002 | 10/8/2002 | 10/8/2002 | A | PART |
Carl Dependahl
|
|
|
###-####...ok to insulate only...keep c/n (needs alarm approval but F.D. is allowing work to continue) 10/8/02 11:03:20 AM
|
BLD-Framing/Rough-in | 10/4/2002 | 10/7/2002 | 10/7/2002 | A | NR |
Carl Dependahl
|
|
|
###-#### ...keep c/n....firestopping, draftstops, eng's ok for multi-ply beam, air seal, etc...recall 10/7/2002 11:51:18 AM
|
BLD-Framing/Rough-in | 10/4/2002 | 10/4/2002 | 10/4/2002 | P | NR |
Carl Dependahl
|
|
|
###-#### after 3:30 pm. complete alarm install 10/4/2002 3:03:24 PM
|
BLD-Framing/Rough-in | 9/9/2002 | 9/10/2002 | 9/10/2002 | P | FAIL |
Carl Dependahl
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung...c/n,courtesy partial insp, 9/10/2002 4:14:10 PM
|
BLD-Conference | 8/12/2002 | 8/13/2002 | 8/13/2002 | A | PASS |
Carl Dependahl
|
|
|
###-#### w/ bldr, arch, & mech eng'r.... install hvac per plan...will consult GS & advise. ok to "wrap" panel for 1hr const at occ sep. or corridor. 8/13/2002 11:53:23 AM
|
BLD-Conference | 8/13/2002 | 8/13/2002 | 8/13/2002 | P | PASS |
Carl Dependahl
|
|
|
W/ GS install hvac per plan... 8/13/2002 4:54:09 PM
|
BLD-Conference | 8/9/2002 | 8/12/2002 | 8/12/2002 | A | CANC |
Carl Dependahl
|
|
|
###-####
|
BLD-Conference | 8/8/2002 | 8/8/2002 | 8/8/2002 | P | PASS |
Carl Dependahl
|
|
|
###-####...add fireblocks, draft stops. brg for 2nd fl joists (32'?) need hvac consult w/ eng'r re corridor penetrations 8/8/2002 5:27:25 PM
|
BLD-Conference | 8/7/2002 | 8/7/2002 | 8/7/2002 | P | CANC |
Carl Dependahl
|
|
|
|
BLD-Conference | 8/7/2002 | 8/7/2002 | 8/7/2002 | P | PASS |
Carl Dependahl
|
|
|
w/ Rod...resubmittal rec'd, ok'd w/ notes re: relocate laundry & janitor's mop closet....
|
BLD-Framing/Rough-in | 7/25/2002 | 7/25/2002 | 7/25/2002 | P | PART |
Tom Arcoraci
|
|
|
ROD; Phone #: ###-#### roof nailing ok 7/25/2002 2:09:46 PM
|
BLD-Framing/Rough-in | 7/24/2002 | 7/24/2002 | 7/24/2002 | P | PART |
Dave Hannah
|
|
|
###-#### rod shear c/n items coplete on ext shear walls ok to cover 7/24/2002 1:01:07 PM
|
BLD-Framing/Rough-in | 7/23/2002 | 7/23/2002 | 7/23/2002 | P | PART |
Tom Arcoraci
|
|
|
south shear wall ok east and west require 3 inch oc nailing ok to change laundry and janitor areas need new plans for resubmital check roof sheeting size 7/23/2002 2:11:55 PM
|
BLD-Foundation | 6/20/2002 | 6/20/2002 | 6/20/2002 | P | PART |
Carl Dependahl
|
|
|
ROBERT ###-####, steel ok, arch to advise re hd's & panel dimensions 6/20/2002 1:31:32 PM
|
BLD-Footing | 6/18/2002 | 6/19/2002 | 6/19/2002 | A | PART |
Carl Dependahl
|
|
|
###-#### Robert Baker...steel in place, ok to pour ftg! 6/19/2002 11:21:51 AM
|
BLD-Foundation | 6/18/2002 | 6/18/2002 | 6/18/2002 | P | PART |
Carl Dependahl
|
|
|
JUSTIN ###-####...has MTI for epoxy dowels, ftg ok. 6/18/2002 4:07:13 PM
|