BLD-Final | 6/25/2002 | 6/25/2002 | 6/25/2002 | P | PASS |
Steven Webb
|
|
|
fn rick- ###-#### C. of C. #22478 issued. 6/25/2002 3:41:41 PM
|
BLD-Energy code compliance | 2/21/2002 | 2/22/2002 | 2/22/2002 | A | PASS |
Jim Sly
|
|
|
rick- ###-#### energy code Frame OK. 2/22/2002 10:23:06 AM
|
BLD-Energy code compliance | 2/20/2002 | 2/21/2002 | 2/21/2002 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 02/20/2002 at 17:08:09. Contact: ###-####. need to insulate behind tub up stairs ok to cover the rest also need engineering on hold down left side of front window the rest of the shear is ok to cover 2/21/2002 3:04:46 PM
|
BLD-Framing/Rough-in | 2/19/2002 | 2/20/2002 | 2/20/2002 | A | FAIL |
Russ Owen
|
|
|
###-#### RICK c/n posted for shear, new engineering eliminating hold downs is unclear. 2/20/2002 12:04:19 PM
|
BLD-Foundation | 2/5/2002 | 2/6/2002 | 2/6/2002 | P | PART |
Steven Webb
|
|
|
JACK ###-#### wip--80% ready at time of inspection. 2/6/2002 2:01:50 PM
|
BLD-Footing | 2/4/2002 | 2/5/2002 | 2/5/2002 | P | NR |
Steven Webb
|
|
|
###-#### JACK
|
BLD-Footing | 2/5/2002 | 2/5/2002 | 2/5/2002 | P | PART |
Steven Webb
|
|
|
###-#### wip--80% ready at time of inspection. 2/5/2002 2:22:15 PM
|