BLD-Final | 5/23/2002 | 5/24/2002 | 5/24/2002 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 05/23/2002 at 16:58:09. Contact: ###-####.
|
BLD-Final | 5/22/2002 | 5/23/2002 | 5/23/2002 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/22/2002 at 14:09:44. Contact: ###-####.energy code items 5/23/2002 10:42:10 AM
|
BLD-Energy code compliance | 3/25/2002 | 3/26/2002 | 3/26/2002 | A | FAIL |
Jim Storey
|
|
|
###-#### c/n re-insp fee due/ c/n not done third trip to site/ u vaule on engery report on glazing not per design 3/26/2002 9:39:47 AM
|
BLD-Energy code compliance | 3/26/2002 | 3/26/2002 | 3/26/2002 | P | PART |
Jim Storey
|
|
|
Added by Inspector: 301 On 3/26/2002 3:43:58 PM holddowns ok / need to justfy u value on windows .49 instaled/ .54 spec. ok to cover.
|
BLD-Energy code compliance | 3/20/2002 | 3/25/2002 | 3/25/2002 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 03/20/2002 at 15:00:27. Contact: .
|
BLD-Framing/Rough-in | 3/22/2002 | 3/22/2002 | 3/22/2002 | P | PART |
Steven Webb
|
|
|
###-#### KAREN c/n-ok to insulate 3/22/2002 2:06:57 PM
|
BLD-Framing/Rough-in | 3/20/2002 | 3/22/2002 | 3/22/2002 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/20/2002 at 14:58:38. Contact: . No approved plans or truss package on site at time of inspection. 3/22/2002 9:27:23 AM
|
BLD-Framing/Rough-in | 3/7/2002 | 3/8/2002 | 3/8/2002 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/07/2002 at 14:56:33. Contact: ###-####. C/N Retro HDs at S. Gar wing. OK to side. 3/8/2002 11:53:44 AM
|
BLD-Foundation | 2/19/2002 | 2/20/2002 | 2/20/2002 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 02/19/2002 at 10:18:59. Contact: ###-####. work in progress 2/20/2002 3:20:37 PM
|
BLD-Footing | 2/19/2002 | 2/19/2002 | 2/19/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/19/2002 at 10:18:05. Contact: ###-####.
|