BLD-Final | 5/14/2002 | 5/14/2002 | 5/14/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/14/2002 at 07:58:53. Contact: ###-####. c.c # 23095 issued 5/14/2002 12:49:32 PM
|
BLD-Final | 5/8/2002 | 5/9/2002 | 5/9/2002 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/08/2002 at 10:49:11. Contact: ###-####. c/n on site-needs mech. and plumbing finals. 5/9/2002 9:48:19 AM
|
BLD-Energy code compliance | 4/1/2002 | 4/1/2002 | 4/1/2002 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/01/2002 at 06:45:51. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/29/2002 | 3/29/2002 | 3/29/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/29/2002 at 07:19:11. Contact: (208) 3/29/2002 11:00:14 AM ok to insulate 3/29/2002 11:00:25 AM
|
BLD-Framing/Rough-in | 3/27/2002 | 3/27/2002 | 3/27/2002 | P | FAIL |
Dave Hannah
|
|
|
###-#### CURT needs seal package installed c/n also on site do not insulate 3/27/2002 3:02:41 PM
|
BLD-Framing/Rough-in | 3/21/2002 | 3/25/2002 | 3/25/2002 | P | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/21/2002 at 07:33:23. Contact: ###-####. Elec. rough in not approve, no seal package--re-call when ready for frame. Do not insulate. 3/25/2002 3:11:31 PM
|
BLD-Other | 3/21/2002 | 3/21/2002 | 3/21/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 3/21/2002 1:57:47 PM SHEAR--ok to side 3/21/2002 2:08:35 PM
|
BLD-Framing/Rough-in | 3/20/2002 | 3/20/2002 | 3/20/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/20/2002 at 07:13:43. Contact: ###-####.c/nm 3/20/2002 1:52:08 PM
|
BLD-Framing/Rough-in | 3/1/2002 | 3/5/2002 | 3/5/2002 | A | PART |
Steven Webb
|
|
|
wip--FOUNDATION NOT FRAMING 3/5/2002 10:02:31 AM
|
BLD-Footing | 3/1/2002 | 3/4/2002 | 3/4/2002 | P | PART |
Dave Hannah
|
|
|
###-#### work in progress checked setbacks onstring lines all look ok crew still setting forms 3/4/2002 2:51:54 PM
|